Summer Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70track

Free USGBC LEED-Green-Associate Practice Exam with Questions & Answers | Set: 7

Questions 61

The LEED Project team performs an initial review that indicates 34 credit points can be achieved from the credit categories. How many additional points would result in the project achieving LEED Silver?

Options:
A.

10 additional points

B.

15 additional points

C.

20 additional points

D.

30 additional points

USGBC LEED-Green-Associate Premium Access
Questions 62

ASHRAE 189.1 is an alternative compliance path to what building code?

Options:
A.

American National Standards Institute (ANSI)

B.

International Green Construction Code (IGCC)

C.

ASHRAE 90.1

D.

California ' s Title 24

Questions 63

Utilizing recycled materials achieves the green building objective of

Options:
A.

minimizing the need for landfills

B.

promoting the use of virgin materials and resources

C.

encouraging environmentally responsible forest management

D.

increasing demand for products extracted and manufactured within the region

Questions 64

Which of the following is a cause of surface water degradation?

Options:
A.

Rainwater harvesting

B.

Expansion of pervious surfaces

C.

Expansion of impervious surfaces

D.

Expansion of outdoor filtration systems

Questions 65

Which of the following team members should participate in the initial evaluation to determine which level of LEED certification to target?

Options:
A.

Owner

B.

Zoning Official

C.

Project Safety Officer

D.

Green Business Certification Inc. (GBCI) Certification Reviewer

Questions 66

What is the scope of the LEED impact category component Protect Human Health from Direct Exposure to Negative Health Impacts?

Options:
A.

Building occupants during use and demolition phase of the building cycle, within the project boundary

B.

Occupants and construction crew during construction or renovation phase of the building cycle, within the project boundary

C.

Design and construction crew during the construction phase, within the project boundary and excluding its immediate surroundings

D.

Building occupants and design and construction crew during the construction phase and use phase ol the building cycle, within the project boundary and its immediate surroundings

Questions 67

What purpose does a LEED impact category serve?

Options:
A.

Describes the issues that LEED projects are not meant to address

B.

Determines the number of potential technical pathways accepted by LEED for each credit

C.

Determines the number of points needed in each category to achieve a certain certification level

D.

Helps project teams understand LEED system goals and determine what a LEED project should accomplish

Questions 68

Which of the following strategies should a project owner implement to understand water consumption?

Options:
A.

Use waterless urinals

B.

Use graywater for flush fixtures

C.

Install permanent water meters

D.

Install an onsite wastewater system

Questions 69

A city is experiencing significant congestion in its downtown core due to excessive reliance on single-occupancy vehicles. The municipal government decides to implement a Transportation Demand Management (TDM) plan to alleviate traffic congestion and reduce vehicle miles traveled (VMT). Which of the following strategies could be included in the city’s TDM plan to effectively reduce VMT?

Options:
A.

Add more highway lanes to reduce traffic

B.

Limit the number of parking spots in the downtown area

C.

Subsidize electric vehicle purchases for residents

D.

Increase minimum parking requirements for all buildings

Questions 70

What is the primary purpose of using low-emitting partitions in office buildings?

Options:
A.

To reduce CO₂ levels

B.

To increase thermal comfort

C.

To increase spread of daylight

D.

To reduce volatile organic compounds (VOCs) levels

USGBC Related Exams

How to pass USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED AP BD+C) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.