Summer Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

Free USGBC LEED-Green-Associate Practice Exam with Questions & Answers | Set: 4

Questions 31

Limiting the concentration of which of the following substances protects the health of construction personnel?

Options:
A.

Biomass

B.

Compostable materials

C.

vocs

D.

CFC refrigerants

USGBC LEED-Green-Associate Premium Access
Questions 32

LEED certification steps generally proceed in which of the following order?

Options:
A.

Project Registration, Application Preparation, Submission, Application Review, Certification

B.

Application Preparation, Application Review, Project Registration, Submission, Certification

C.

Select LEED rating system, Submission, Application Review, Project Registration, Certification

D.

Application Preparation, Project Registration, Application Review, Submission, Certification

Questions 33

A project team has three principal participants with LEED AP credentials. One is an energy modeler, one is a civil engineer and the third one is a general contractor. Under which category can their credentials contribute a point?

Options:
A.

Innovation

B.

Commissioning (Cx)

C.

Sustainable Sites

D.

Energy and Atmosphere

Questions 34

Teams organize and work as part of an integrative process by working

Options:
A.

With team members in a linear pattern

B.

in smaller groups with nonrepetitive processes

C.

in small groups and as a Whole With iterative processes

D.

with team members having individual commitments and tasks

Questions 35

Which of the following is the most important phase of the integrative process?

Options:
A.

Design Phase

B.

Operation Phase

C.

Discovery Phase

D.

Construction Phase

Questions 36

Which Is a component of a construction waste management plan?

Options:
A.

List of materials to be diverted from disposal

B.

Projected cost savings from diverting waste

C.

Quantity of waste generated from excavated soil

D.

Distance of the recycling facility from the project site

Questions 37

The goal of regional priority credits is to incentivize project teams to

Options:
A.

use a LEED AP on the design team

B.

increase environmental education and advocacy

C.

achieve credits that address geographical specific environmental issues

D.

prioritize the needs of certain areas in the country that have more environmental impact needs than others

Questions 38

According to a study completed by the Heschong Mahone Group, which of the following Indoor Environmental Quality strategies can improve student test scores in schools by 7%-18%?

Options:
A.

Installing ergonomic furniture

B.

Putting plants in the classroom

C.

Providing increased dayliqhting

D.

Using thermal comfort controls

Questions 39

Which credit category attempts to reduce light pollution and discourages the development of previously undeveloped land?

Options:
A.

Regional Priority

B.

Sustainable Sites

C.

Energy and Atmosphere

D.

Location and Transportation

Questions 40

In order to earn LEED certification, a project must

Options:
A.

employ a LEED AP on its project team

B.

conduct a whole-building life-cycle assessment

C.

earn a minimum 0t 50 points or meet a prerequisite

D.

satisfy all prerequisites and earn a minimum number of points

USGBC Related Exams

How to pass USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED AP BD+C) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.