Free USGBC LEED-Green-Associate Practice Exam with Questions & Answers | Set: 4

Questions 31

Which of the following is a type of quality transit in LEED?

Options:
A.

Taxi

B.

Bicycle

C.

Motorcycle

D.

Single passenger car

USGBC LEED-Green-Associate Premium Access
Questions 32

Which of the following benefits could result from achieving LEED certification for a building?

Options:
A.

Preferred public parking

B.

Increased waste to landfills

C.

Qualification for tax rebates

D.

Dedicated public transportation infrastructure

Questions 33

What rating system should a project use if 55% of the project's gross floor area is appropriate to certify under LEED BD+C and 45% is appropriate under LEED O+M?

Options:
A.

LEED Building Design and Construction

B.

LEED Operations and Maintenance

C.

LEED Green Associate must decide which rating system is most applicable

D.

Project team must decide which rating system is most applicable

Questions 34

Which of the following credit categories is affected by increasing the amount of ventilation in an occupied space?

Options:
A.

Water Efficiency

B.

Indoor Ventilation and Energy

C.

Indoor Environmental Quality

D.

Materials and Resources

Questions 35

What plumbing fixture eliminates water use?

Options:
A.

Ultrasonic toilet

B.

WaterSense labeled toilet

C.

Low-flow lavatory

D.

Composting toilet

Questions 36

What is reclaimed water?

It is potable water from a well within the project boundary and owned by the project owner

Options:
A.

It is wastewater that may have undergone treatment from a nearby plant and is intended for non potable use

B.

It is a quota of potable water reclaimed to the utility company should the project water consumption C. fall more than 20% lower than the Energy Policy Act of 1992 (EPAct of 1992) baseline

C.

It is graywater treated within the project premises and sold back to the utility company

Questions 37

Which of the following sites is most appropriate to encourage a walkable street design?

Options:
A.

A neighborhood that includes a diversity of use

B.

An area with a decreased building-height-to-street-width ratio

C.

A development that uses many culs-de-sac in the street design

D.

A project in an area designed with streets to facilitate increased speed limits

Questions 38

The cost of Commissioning (Cx) Is often repaid with

Options:
A.

advanced energy metering

B.

renewable power management

C.

recovered energy performance

D.

enhanced refrigerant management

Questions 39

Which factor increases the heat island effect on a project site?

Options:
A.

High albedo

B.

Light-colored surfaces

C.

Paved surfaces

D.

High solar reflectivity index

Questions 40

Materials that would otherwise be discarded but are incorporated into a new building are considered to be

Options:
A.

reused materials

B.

local materials

C.

recycled materials

D.

renewable materials

USGBC Related Exams

How to pass USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED AP BD+C) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.