Questions 1

A developer has 100 acres (40 declares) of undeveloped forest The vision of the community is to preserve over 60% of the land as undeveloped Which of the following can help the project to quality for the Smart Location and Linkage Prerequisite. Smart Location?

Options:
A.

The project contains no criticalhabitats

B.

The project is along a planned transit condor for the county

C.

The project is planned for a density at 10 dwelling units (DU) per acre (25 DU/hectare)

D.

The project is in a receiving area for a Transfer of Development Rights program

USGBC LEED-AP-ND Premium Access
Questions 2

A standardized base map that should be used throughout the submission to illustrate relevant surrounding features forup to 1 mi.(1.6 km) around the project boundary is a

Options:
A.

special map.

B.

permit map.

C.

vicinity map

D.

project site map.

Questions 3

What can be omittedfrom the calculation verifying the percentage of reuse of buildings undergoing major renovation?

Options:
A.

Roof decking

B.

Structural floor

C.

Exterior skin and framing

D.

Nonstructural roofing material

Questions 4

A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?

Options:
A.

One

B.

Two

C.

Three

D.

Five

Questions 5

A 10-acre ((our hectare) project has 5.000 ft (1 524 m) of sidewalks Trees and trellises are planned along several ofthose blocks to provide shading for the sidewalks In order to achieve Neighborhood Pattern and Design Credit Tree-Lined and Shaded Streetscapes. what is the minimum shaded sidewalk that would need to be provided?

Options:
A.

1,000 ft. (305 m)

B.

2,000 ft. (610 m)

C.

3,000 ft. (915 m)

D.

4,000 ft. (1 220 m)

Questions 6

Winch of the following minor improvements withina required buffer zone may be undertaken to enhance appreciation for a wetland or body of water, provided such facilities are open to public access?

Options:
A.

Build one single-story structure not exceeding 1.000 ft2 (93 m2) per 300 linear feet of Outer, on average

B.

Remove hazardous trees, up to 100% of dead trees, and trees less than eight in. (20 cm) in diameter at breast height

C.

Add bicycle and pedestrian pathways that are no more than 12 ft. (3.5 m) wide and where no more than 8 ft. (2.5 m) of their width may be impervious

D.

Create new clearings, not exceeding 1.000 ft2 (95 m2) each, for tables, benches and access for recreational watercraft

Questions 7

Acultural landscape is identifiedon a project site. Which action contributes to Green Infrastructure and Buildings Credit. Historic Resource Preservation and Adaptive Reuse?

Options:
A.

Hire a registered landscape architect to enhance the design of thelandscape

B.

Provide educational case study and signage about the history of the project site

C.

Construct wetlands using nativeplants to improve hydrology, controlstormwater runoff. and provide wildlife habitat

D.

Contact the state historic preservation office of the National Park Service, or local equivalent to determine if the landscape is registered as a historic site

Questions 8

Which of the following are eligible sources of renewable energy under Green Infrastructure and Buildings Credit. Renewable Energy Production?

Options:
A.

Passive solar heating strategies offsetting heating energy use

B.

Cogeneration of electricity and heat using mill residue biomass

C.

Geothermal energy used in conjunction with a ground-source Moat pump

D.

Photovoltaic energy generation purchased from an off-site location

Questions 9

Atleast how many buildings within a LEED for Neighborhood Development project must be certified by a green building rating system?

Options:
A.

One building

B.

Two buildings

C.

Three buildings

D.

Four buildings

Questions 10

Which of the following can be included within the boundary of a project site on an urban waterfront?

Options:
A.

Dock to be constructed by the developer

B.

House boats in place prior to the issuance of certificate of occupancy

C.

Marina pier in place prior to the date of property acquisition

D.

Jetty with funding for construction prior to the date of certification

Exam Code: LEED-AP-ND
Certification Provider: USGBC
Exam Name: LEED AP Neighborhood Development (LEED ND)
Last Update: Jul 10, 2025
Questions: 100
PDF + Testing Engine
$164.99
$66
Testing Engine
$124.99
$50
PDF (Q&A)
$104.99
$42

USGBC Related Exams

How to pass USGBC LEED-Green-Associate - LEED Green Associate Exam Exam
How to pass USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED AP BD+C) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.