A developer has 100 acres (40 declares) of undeveloped forest The vision of the community is to preserve over 60% of the land as undeveloped Which of the following can help the project to quality for the Smart Location and Linkage Prerequisite. Smart Location?
A standardized base map that should be used throughout the submission to illustrate relevant surrounding features forup to 1 mi.(1.6 km) around the project boundary is a
What can be omittedfrom the calculation verifying the percentage of reuse of buildings undergoing major renovation?
A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?
A 10-acre ((our hectare) project has 5.000 ft (1 524 m) of sidewalks Trees and trellises are planned along several ofthose blocks to provide shading for the sidewalks In order to achieve Neighborhood Pattern and Design Credit Tree-Lined and Shaded Streetscapes. what is the minimum shaded sidewalk that would need to be provided?
Winch of the following minor improvements withina required buffer zone may be undertaken to enhance appreciation for a wetland or body of water, provided such facilities are open to public access?
Acultural landscape is identifiedon a project site. Which action contributes to Green Infrastructure and Buildings Credit. Historic Resource Preservation and Adaptive Reuse?
Which of the following are eligible sources of renewable energy under Green Infrastructure and Buildings Credit. Renewable Energy Production?
Atleast how many buildings within a LEED for Neighborhood Development project must be certified by a green building rating system?
Which of the following can be included within the boundary of a project site on an urban waterfront?