Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70track

Free USGBC LEED-Green-Associate Practice Exam with Questions & Answers | Set: 2

Questions 11

Approximately what percentage of the Earth’s water is fresh water?

Options:
A.

4%

B.

1%

C.

2%

D.

3%

USGBC LEED-Green-Associate Premium Access
Questions 12

A building is located on a site without access to public transportation. Which of the following strategies can a project team implement in order to reduce the environmental impacts associated with how the occupants get to and from the building?

Options:
A.

Limit parking

B.

Provide incentives for carpooling

C.

Build underground parking structure

D.

Use compact development strategies

Questions 13

Which action promotes pedestrian access to a project site?

Options:
A.

Placing a low speed limit in the parking lot around the building

B.

Providing shuttle access between the project site and a local transit center

C.

Designating parking spaces closest to the building for exclusive use by carpooling vehicles

D.

Utilizing an existing community nature path connecting the building to surrounding buildings

Questions 14

What rating system should a project use if 55% of the project's gross floor area is appropriate to certify under LEED BD+C and 45% is appropriate under LEED O+M?

Options:
A.

Project team must decide which rating system is most applicable

B.

LEED Green Associate must decide

C.

LEED BD+C

D.

LEED O+M

Questions 15

Approximately what percentage of the Earth's water is fresh water?

Options:
A.

3%

B.

4%

C.

1%

D.

2%

Questions 16

In order to earn LEED certification, a project must

Options:
A.

employ a LEED AP on its project team

B.

conduct a whole-building life-cycle assessment

C.

earn a minimum 0t 50 points or meet a prerequisite

D.

satisfy all prerequisites and earn a minimum number of points

Questions 17

At which stage should the coordination of building and site systems be addressed to maximize the impact of integrative process?

Options:
A.

Predesign

B.

Detailed Design

C.

Post Occupancy

D.

Schematic Design

Questions 18

Which of the following is the reason Regional Priority credits are awarded?

Options:
A.

To help meet economic goals

B.

To encourage exemplary performance

C.

To address local environmental issues

D.

To promote innovation in building design

Questions 19

Which of the following standards addresses guidance for sustainable construction in complying with building codes?

Options:
A.

ASHRAE 72

B.

ASHRAE 62.1

C.

ASHRAE 90.1

D.

ASHRAE 189.1

Questions 20

Which of the following Is a strategy for improving Indoor Environmental Quality during construction?

Options:
A.

Cover duct work with plastic

B.

Store absorptive-finish materials directly on slab

C.

Collect construction debris in the mechanical room

D.

Run permanently installed HVAC with final filtration media

USGBC Related Exams

How to pass USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED AP BD+C) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.