Which of the following Is the recommended tool for the project team to utilize In order to determine the target certification level?
A building manager is comparing the operating cost of the existing boiler to the purchase and operation of a new and more efficient boiler. The building manager discovers that although the upfront cost is significant, purchasing the new boiler would drastically decrease the cost of running and operating the system. This exercise is called
ASHRAE standards are applicable to which of the following LEED categories?
During which stage of the conventional building process are each disciplined practitioner on project teams involved?
The roofing materials used on site for reducing the heat island effect must have
According to the LEED Minimum Program Requirements (MPR) specifying minimum occupancy rates, a project must serve how many occupants?
In the commercial LEED Rating System, which point range will achieve the Certified level of certification?
In a large site that has a short, intense rainy season and a long, dry season, what component of a collected rainwater irrigation system is most likely to make it cost prohibitive over a conventional system?
Strategies for improving building occupants' comfort and control may consist of
An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants' comfort?
|
PDF + Testing Engine
|
|---|
|
$49.5 |
|
Testing Engine
|
|---|
|
$37.5 |
|
PDF (Q&A)
|
|---|
|
$31.5 |
USGBC Free Exams |
|---|
|