Summer Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70track

Free USGBC LEED-Green-Associate Practice Exam with Questions & Answers | Set: 12

Questions 111

An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants ' comfort?

Options:
A.

LEED AP

B.

Leasing Agent

C.

Facilities Manager

D.

Commissioning (Cx) Agent

USGBC LEED-Green-Associate Premium Access
Questions 112

The Location and Transportation (LT) credit category encourages which of the following strategies?

Options:
A.

Reduce the urban heat island effect

B.

Build on a previously disturbed site

C.

Encourage views to the exterior

D.

Reduce landscape water use

Questions 113

A tile manufacturer produces tiles that are made from fully recyclable materials and are designed for easy disassembly and possible recycling at the end of their life. Which of the following life cycle assessment approaches does this manufacturer use?

Options:
A.

Cradle to cradle

B.

Cradle to site

C.

Cradle to grave

D.

Cradle to gate

Questions 114

Which of the following strategies can contribute to optimal thermal comfort for building occupants?

Options:
A.

Scheduling regular HVAC system maintenance

B.

Installing ceiling fans only in common areas

C.

Utilizing large open spaces for air circulation only

D.

Removing individual thermal comfort controls

Questions 115

According to systems thinking, climate change is an example of which of the following feedback loops?

Options:
A.

Stable

B.

Isolated

C.

Positive

D.

Balancing

Questions 116

A landscape architect, a civil engineer, and a city planner collaborate to reduce stormwater runoff at a new building. This collaboration is an example of what strategy?

Options:
A.

Integrative process

B.

Siloed design

C.

Rainwater management

D.

Life-cycle approach

Questions 117

Which of the following project types and scopes are addressed by LEED rating systems?

Options:
A.

LEED Operations & Maintenance: Schools

B.

LEED Interior Design and Construction: Data Centers

C.

LEED Building Design and Construction: Existing Buildings

D.

LEED Neighborhood Development: Warehouses and Distribution

Questions 118

What strategy ranks first in the waste hierarchy to minimize construction waste on a project?

Options:
A.

Source reduction

B.

Waste-to-energy

C.

Recycling

D.

Reuse

Questions 119

Which of the following strategies meets energy demand with renewable energy?

Options:
A.

Installing a solar hot water heater

B.

Incinerating waste to heat a home

C.

Implementing a composting program in an office break room

D.

Purchasing Renewable Energy Certificates (RECs)from a clean coal plant

Questions 120

A building is located on a site without access to public transportation. Which of the following strategies can a project team implement in order to reduce the environmental impacts associated with how the occupants get to and from the building?

Options:
A.

Limit parking

B.

Provide incentives for carpooling

C.

Build underground parking structure

D.

Use compact development strategies

USGBC Related Exams

How to pass USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED AP BD+C) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.