An architect found a source for reclaimed wood doors from a recently demolished building 600 mi. (966 km) away from the project site. Towards which of the following sustainable criteria can the doors be used?
Which impact category is weighted the most in the LEED rating systems?
The general contractor for a project located in a dense urban area attempts to gain a credit in Materials and Resources. Which of the following is considered a local material?
Which of the fallowing projects is eligible for LEED for Building Operations and Maintenance; Existing Buildings?
Which class of refrigerants contributes the most to ozone depletion potential (ODP)?
The use of native plant species, captured rainwater and evapotranspiration controllers are all strategies that contribute to
Which LEED adaptation includes the ability to reduce point thresholds for LEED certification levels based on building size?
Integrated Project Planning and Design is a prerequisite for which type of buildings?
Utilizing recycled materials achieves the green building objective of
The Energy Policy Act of 1992 (EPAct of 1992), 2005 is a baseline standard for the credit category of
PDF + Testing Engine
|
---|
$57.75 |
Testing Engine
|
---|
$43.75 |
PDF (Q&A)
|
---|
$36.75 |
USGBC Free Exams |
---|
![]() |