Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70track

Free USGBC LEED-Green-Associate Practice Exam with Questions & Answers | Set: 10

Questions 91

Installing which of the following will increase the quantity of the rainwater that is discharged from a site?

Options:
A.

Vegetated roof

B.

Porous pavers for parking lots

C.

Concrete sidewalks and parking areas

D.

Bioswales and ram gardens with native plants

USGBC LEED-Green-Associate Premium Access
Questions 92

A project team has three principal participants with LEED AP credentials. One is an energy modeler, one is a civil engineer and the third one is a general contractor. Under which category can their credentials contribute a point?

Options:
A.

Innovation

B.

Commissioning (Cx)

C.

Sustainable Sites

D.

Energy and Atmosphere

Questions 93

Which of the following sites would maximize LEED points under Location and Transportation?

Options:
A.

Greenfield site in an urban area with substantial transit connectivity

B.

Infill site on the outskirts of a city with some transportation connectivity

C.

Greenfield site in a low-density area with some transportation connectivity

D.

Infill site within an existing neighborhood with substantial transit connectivity

Questions 94

Which of the following projects would be appropriate to pursue LEED certification according to the Minimum Program Requirements (MPRs)?

Options:
A.

A new parking garage construction occupying a total of 15,000 ft² gross floor area

B.

A new building that will occupy 12,000 ft² gross floor area on previously developed land

C.

A historic building intended for restoration occupying 900 ft² of gross floor area

D.

A movable house attached to a trailer that can be moved from state to state

Questions 95

A tile manufacturer produces tiles that are made from fully recyclable materials and are designed for easy disassembly and possible recycling at the end of their life. Which of the following life cycle assessment approaches does this manufacturer use?

Options:
A.

Cradle to cradle

B.

Cradle to site

C.

Cradle to grave

D.

Cradle to gate

Questions 96

Building and material reuse contribute to the sustainability goals of a project by

Options:
A.

reducing the use Of raw materials

B.

saving time during the material selection phase

C.

lowering the overall construction budget of the project

D.

utilizing waste-to-energy as an alternative to fossil fuel extraction

Questions 97

Light trespass beyond the project boundary can be prevented by the use of

Options:
A.

flood light fixtures

B.

up-lighting fixtures

C.

shielded light fixtures

D.

increasing the number of light fixtures

Questions 98

What is the current standard LEED uses to determine the baseline for indoor water savings?

Options:
A.

Energy Policy Act (EPACT) of 1992. 2005

B.

ANSI 17024

C.

The local standard in which the project is located

D.

The Energy Savings and Industrial Competitiveness Act of 2013

Questions 99

Minimizing impervious surfaces, protecting soils, and enhancing native vegetation are all strategies that:

Options:
A.

Optimize outdoor water use

B.

Reduce light pollution

C.

Decrease construction activity pollution

D.

Improve rainwater management

Questions 100

What design processes are emphasized with Green buildings?

Options:
A.

Integrative

B.

Tiered

C.

Linear

D.

Multistage

USGBC Related Exams

How to pass USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED AP BD+C) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.