A work authorization system can be used to:

Options:
A.

Manage who does each activity.

B.

Manage when and in what sequence work is done.

C.

Manage when each activity is done.

D.

Manage who does each activity and when it is done.

BCS ISEB-PM1 Premium Access
Questions 137

Which tool and technique uses a statistical relationship between historical data and other variables to calculate estimates?

Options:
A.

Analogous estimating

B.

Three-point estimates

C.

Parametric estimating

D.

Bottom-up estimating

Questions 138

What is the minimum a project schedule must include?

Options:
A.

Variance analysis

B.

A planned start date and a planned finish date for each schedule activity

C.

A critical path diagram

D.

Critical chain analysis

Questions 139

Your company has asked you to be the project manager for the product introduction of its new DeskTop Rock media system. You recently published the project scope statement.

Which of the following is not contained in the project scope statement?

Options:
A.

Requested changes

B.

Project configuration management requirements

C.

Constraints

D.

Project specifications

Questions 140

What cost control technique is used to compare actual project performance to planned or expected performance?

Options:
A.

Cost aggregation

B.

Trend analysis

C.

Forecasting

D.

Variance analysis

Questions 141

The basic elements of communication include:

Options:
A.

Reading, writing and listening

B.

Communicator, encoding, message, medium, decoding, receiver, and feedback

C.

All of the other alternatives apply

D.

Clarity of speech and good listening habits

E.

Listening, talking and sign language.

Questions 142

What does a SPI value greater than 1.0 indicate?

Options:
A.

More work was completed than planned

B.

Less work was completed than planned

C.

Cost overrun for completed work has occurred

D.

Cost underrun for completed work has occurred

Questions 143

Giving a part of project work to a contractor is an example of:

Options:
A.

risk assumption

B.

risk assignment

C.

risk delegation

D.

risk deflection

E.

risk mitigation

Questions 144

A project manager and team from a firm that designs railroad equipment are tasked to design a machine to load stone onto railroad cars. The design allows for two percent spillage, amounting to over two tons of spilled rock per day.

In which of the following does the project manager document quality control, quality assurance, and quality improvements for this project?

Options:
A.

Quality management plan

B.

Quality policy

C.

Control charts

D.

Project management plan

Questions 145

Parametric cost estimating involves _____________.

Options:
A.

using a statistical model to estimate costs

B.

calculating the individual estimates of work packages

C.

defining the perimeters of the life-cycle

D.

using the WBS to do bottom up estimates

E.

Both 1) using the WBS to do bottom up estimate, and 2) calculating the individual estimates of work packages

Questions 146

Which of the following risk management processes uses brainstorming as a technique?

Options:
A.

Identify Risks

B.

Monitor and Control Risks

C.

Plan Risk Management

D.

Plan Risk Responses

Questions 147

A summary WBS is usually developed in the ___________.

Options:
A.

close-out phase

B.

All of the other alternatives apply phases

C.

implementation phase

D.

planning phase

E.

Conceptual phase

Questions 148

To complete performance index (TCPI) is represented by which of the following?

Options:
A.

BAC - EV/BAC - AC

B.

A measure of the value of work completed compared to the actual cost or progress

C.

A measure of progress achieved compared to progress planned

D.

AC + (BAC - EV)

Questions 149

Which analysis uses beta and triangular distributions as a tool and technique?

Options:
A.

Quantitative risk analysis

B.

Qualitative risk analysis

C.

Perform quality assurance

D.

Perform quality control

Questions 150

Which of the following is a technique for resolving conflict?

Options:
A.

Collaborating

B.

Issue log

C.

Leadership

D.

Motivation