Free USGBC LEED-AP-BD+C Practice Exam with Questions & Answers | Set: 9

Questions 81

For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

Options:
A.

Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimony

B.

Fabric, 5% of product by weight, with stain resistant treatment containing Perfluorinated Compounds (PFCs)

C.

Metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium

D.

Plastic armrests, 30% of product by weight, with added antimicrobial treatment

USGBC LEED-AP-BD+C Premium Access
Questions 82

Which item is included in the reuse calculation for MRc1: Building and Materials Reuse?

Options:
A.

Roofing membranes

B.

Asbestos insulation

C.

Floor decking

D.

Exterior glazing

Questions 83

A project team is working on a mixed-use development aiming to achieve LEED certification. The client wishes to limit on-site combustion as a strategy for future electrification readiness. The building will include residential units, retail spaces, and a central heating system.

Which of the following strategies should the project team implement to support the goal of electrification readiness and limit on-site combustion?

Options:
A.

Include electric vehicle charging stations in the parking area

B.

Utilize a high-efficiency gas boiler for space heating

C.

Implement a solar thermal system for hot water supply

Questions 84

Commissioning (Cx) and verification are requirements to qualify for LEED certification. What are the basic systems that need to be commissioned?

Options:
A.

Electrical, Mechanical, Plumbing, and Renewable Energy

B.

Electrical, Structural, Mechanical, and Lighting

C.

Electrical, Structural, Audio Visual, and Envelope

D.

Electrical, Plumbing, Telecommunications, and Fire Suppression

Questions 85

During the early design phase of a new commercial office building, what action should the project team take to reduce the Global Warming Potential (GWP) of refrigerants?

Options:
A.

Select an HVAC system that uses refrigerants with a GWP of 700 or less

B.

Delay addressing refrigerant concerns until the commissioning phase, when system performance can be evaluated

C.

Specify any HVAC system and offset refrigerant emissions through carbon credits later, if needed

Questions 86

Which of the following groups of documents is most likely to support both Indoor Environmental Quality Credit,

Thermal Comfort, and Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

Options:
A.

Architectural floor plans, mechanical plans, lighting plans

B.

Photometric plans, mechanical schedules, lamp specifications

C.

Lighting plans, surveys of occupants, sequence of operations

D.

Surveys of occupants, photometric plans, mechanical schedules

Questions 87

A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:

Options:
A.

At least75% of qualifying land areas within ¾ mile (1.20 km)are previously developed

B.

At least75% of qualifying land areas within ½ mile (0.80 km)are previously developed

C.

The site is a brownfield as defined by the Environmental Protection Agency (EPA)

D.

The project is a Federal Renewal Community site

Questions 88

A mixed-use development project located in an urban area includes office spaces, retail shops, and residential units. Which of the following actions should the project team consider to improve the sustainable transportation strategies for this development?

Options:
A.

Reduce the total number of parking spaces in alignment with local regulations

B.

Implement an educational campaign about the benefits of public transportation

C.

Integrate public transportation subsidies for residents

Questions 89

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:
A.

Measure densities within a¼ mile (0.40 km) radiusof the project boundary

B.

Measure densities within a¾ mile (1.20 km) radiusof the project boundary

C.

Measure densities within a⅓ mile (0.53 km) radiusof the project boundary

D.

Measure densities within a½ mile (0.80 km) radiusof the project boundary

Questions 90

Which is a benefit of earning Regional Priority credits?

Options:
A.

The LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project ' s location

B.

The context of the project ' s location is not addressed, allowing the project team to focus on the building ' s priority issues

C.

The project ' s operations are considered separately from design and construction, allowing the project team to focus on regional issues

D.

The LEED project is able to skip a review phase by considering the issues that are a priority in the project ' s location

USGBC Related Exams

How to pass USGBC LEED-Green-Associate - LEED Green Associate GAFRE Exam (LEED GA) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M v5) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.