Free USGBC LEED-AP-BD+C Practice Exam with Questions & Answers | Set: 8

Questions 71

A project ' s massing and site orientation can have a direct impact on which of the following prerequisites?

Options:
A.

Minimum Energy Performance

B.

Minimum Indoor Air Quality Performance

C.

Construction Activity Pollution Prevention

D.

Fundamental Commissioning and Verification

USGBC LEED-AP-BD+C Premium Access
Questions 72

Which of the following components is critical for developing a successful water-balance model for WEc2: Enhanced Water Efficiency, Option 1. Whole-Project Water Use?

Options:
A.

Identify all end uses within the project scope, including fixtures and fittings

B.

Prioritise alternative water sources to offset overall water demand

C.

Require equipment specifications to align with the contract documents

Questions 73

Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?

Options:
A.

Install an on-site photovoltaic array

B.

Purchase Green-e certified carbon offsets

C.

Purchase Green-e certified Renewable Energy Certificates (RECs)

D.

Install a ground-source heat pump

Questions 74

Which is a benefit of earning Regional Priority credits?

Options:
A.

The LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project ' s location

B.

The context of the project ' s location is not addressed, allowing the project team to focus on the building ' s priority issues

C.

The project ' s operations are considered separately from design and construction, allowing the project team to focus on regional issues

D.

The LEED project is able to skip a review phase by considering the issues that are a priority in the project ' s location

Questions 75

IPp1: Climate Resilience Assessment identifies a high risk of extreme heat caused by the urban heat-island effect and flooding caused by an impervious site. Which combination identifies an appropriate strategy for heat and sea-level or flooding risks?

Options:
A.

Heat: High-albedo white roofSea level: Emergency backup generators

B.

Heat: High-efficiency variable refrigerant flow systemSea level: Green roof

C.

Heat: Exterior window shading and operable windowsSea level: Sump pumps with backup power

Questions 76

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building ' s location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility ' s project scope. The new building project needs to complete a new Phase I ESA if

Options:
A.

the Phase II ESA uncovers suspected contamination

B.

contamination was identified by the certified facility

C.

the certified facility ' s Phase I ESA is older than 180 days

D.

the local equivalent standard is more stringent than ASTM E1527-05

Questions 77

What type of space should a project team ensure is made available in order to attain the Sustainable Sites Credit, Joint Use of Facilities, Option 1: Make Building Space Open to the General Public?

Options:
A.

Locker rooms

B.

Office of the principal

C.

Health clinic

D.

Auditorium

Questions 78

If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term

bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle

Facilities?

Options:
A.

Three

B.

Four

C.

Five

D.

Ten

Questions 79

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

Options:
A.

A garden space dedicated to industrial food production for use by local communities

B.

A garden space with only one vegetation type and species during the summer for visual interest

C.

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Questions 80

Which of the following variables must be included in the calculations for Indoor Environmental Quality Credit, Quality Views?

Options:
A.

Ceiling heights

B.

Building furniture

C.

Movable partitions

D.

Permanent interior obstructions

USGBC Related Exams

How to pass USGBC LEED-Green-Associate - LEED Green Associate GAFRE Exam (LEED GA) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M v5) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.