Free USGBC LEED-AP-BD+C Practice Exam with Questions & Answers | Set: 3

Questions 21

The Lakeside Resort is a hotel in a rural area located about 60 mi. (96.6 km) from the nearest town, which has a population of 10,500. There are no other towns for over 200 mi. (321.9 km). The surrounding community is largely made up of ranches and federal- and state-owned land.

The project consists of a single building that includes the following:

• 150 guest rooms

• A small restaurant

• An indoor pool

• Conference spaces

• Event spaces

• Six tenant spaces

A lease has been secured for a future spa, gift shop, coffee shop, and tour operator. Two of the six tenant spaces have not yet been leased. The property is 10 acres, adjacent to a lake, and has trail access to public lands for hiking. It is anticipated that occupants will mostly arrive by car, but there is one public bus trip per day from the nearest town.

The project consists of the building, parking lots for overnight guests and daily visitors, a walking path to the lake, and hiking trails leading to the public lands. The project has a goal of being Gold certified under LEED for New Construction.

When determining occupancy for the project, how should the project team account for the occupancy for the future spa, gift shop, coffee shop, tour operator space, and the two unknown tenant spaces?

Options:
A.

Use zero as the number of occupants for unleased spaces

B.

Use an estimate of the number of occupants based on the project team ' s discretion

C.

Use the default occupancy counts from the LEED Reference Guide for the incomplete spaces

USGBC LEED-AP-BD+C Premium Access
Questions 22

Which of the following filtration methods is recommended for an infection risk management mode to enhance indoor air quality (IAQ) in healthcare facilities?

Options:
A.

Activated carbon filtration

B.

Plate-and-frame filters

C.

Ultraviolet germicidal irradiation (UVGI)

Questions 23

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner ' s Project Requirements (OPR)?

Options:
A.

All applicable codes and standards

B.

Interior finishes related to the project

C.

All project team members and applicable roles

D.

Energy efficiency goals and training requirements

Questions 24

Which of the following goals does selecting low-emitting materials serve in the context of MRc3: Low-Emitting Materials?

Options:
A.

Increase thermal insulation

B.

Enhance indoor air quality

C.

Extend the lifespan of building materials

Questions 25

When planning a water-efficient landscape design, the designer should consider including

Options:
A.

potable water

B.

sprinkler system

C.

native vegetation

D.

permeable pavement

Questions 26

Large commercial buildings are most often dominated by

Options:
A.

internal loads

B.

lighting loads

C.

external loads

D.

envelope loads

Questions 27

What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?

    Energy and Atmosphere Credit, Demand Response

    Energy and Atmosphere Credit, Advanced Energy Metering

    Energy and Atmosphere Credit, Building Level Energy Metering

Options:
A.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Questions 28

A corporate office building is implementing a comprehensive waste management program aimed at achieving zero-waste operations. The building management is evaluating strategies to efficiently manage recyclables, compost organics on-site, and safely store hazardous materials such as batteries and mercury-containing lamps. Which of the following actions should the building management take to further improve the waste management program?

Options:
A.

Implement educational workshops on waste sorting and recycling

B.

Mandate individual desk-side recycling bins at all workstations

C.

Centralize waste collection areas to encourage recycling behavior

Questions 29

A project has a potable water source as well as two alternative water sources. Which of the following statements is applicable for a project using two alternative water sources?

Options:
A.

A project may not use two alternative water sources

B.

Target the uses that require the least treatment first

C.

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.

All alternative water sources should be treated to potable water standards

Questions 30

Landscape irrigation practices consume large quantities of potable water. By evaluating the project ' s outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to

Options:
A.

earn Water Efficiency Credit, Water Metering

B.

earn Sustainable Sites Credit, Rainwater Management

C.

estimate and optimize water use in landscape designs

D.

estimate and optimize water use in outdoor fountains and pools

USGBC Related Exams

How to pass USGBC LEED-Green-Associate - LEED Green Associate GAFRE Exam (LEED GA) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M v5) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.