Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:
A.

The general contractor

B.

A LEED AP

C.

The project's mechanical engineer

D.

The owner or an owner's representative

USGBC LEED-AP-BD+C Premium Access
Questions 32

What Color Rendering Index (CRI) value meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

Options:
A.

45

B.

85

C.

25

D.

65

Questions 33

Major renovation projects must meet which of the following minimum percentage savings when taking credit for renewable energy systems?

Options:
A.

5%

B.

3%

C.

2%

D.

8%

Questions 34

The project team is working to reduce the building's total energy costs in a cold climate. Which is the best strategy for the project team to consider?

Options:
A.

Additional envelope insulation

B.

Window shades

C.

Highly reflective roof

D.

Increased cooling efficiency

Questions 35

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

Options:
A.

Site Assessment

B.

Site Development - Protect or Restore Habitat

C.

Heat Island Reduction

D.

Light Pollution Reduction

Questions 36

Large commercial buildings are most often dominated by

Options:
A.

internal loads

B.

lighting loads

C.

external loads

D.

envelope loads

Questions 37

What type of space must have self-closing doors, deck-to-deck partitions, and exhaust fans in order to meet the requirements for Indoor Environmental Quality Credit, Enhanced Air Quality Strategies?

Options:
A.

Data closet

B.

Conference room

C.

Chemical storage

D.

Open office

Questions 38

A newly constructed school has installed solar thermal systems and wind turbines on site. To achieve the maximum number of Energy and Atmosphere points, which team members must be included?

Options:
A.

Energy Modeler and Contractor

B.

Construction Manager and Energy Modeler

C.

Energy Modeler and Commissioning (Cx) Agent

D.

Commissioning (Cx) Agent and Facilities Manager

Questions 39

According to the Integrative Process Credit, the discovery phase of energy-related systems should identify

Options:
A.

ventilation rates

B.

functional performance tests

C.

thermal comfort ranges

D.

transportation options

Questions 40

A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

Options:
A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space then the rating system must not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system must be used

C.

If a rating system is appropriate for 30% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

USGBC Related Exams

How to pass USGBC LEED-Green-Associate - LEED Green Associate Exam Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.