A customer is deploying Nutanix AHV clusters over hundreds of remote sites worldwide. Prism Central will be used to centrally manage all clusters. Customer security policy requires the use of MS Active Directory (AD).groups to authenticate all network devices.
Which method should be consultant use to meet the requirements?
A consultant creates three storage containers (container-1, container-2, container-3). The customer requires that only container-1, which will be utilized as an NFS datastore, be presented to external hosts.
However, users are able to mount all three containers.
What is causing this problem?
After an onsite cluster deployment, a consultant prepares the deliverables for a project closeout.
Which two data in the As-Built Guide require adjustment or might be missing completely? (Choose two.)
As a consultant concludes the project for deploying a new cluster, the customer expresses plans to repeat the process in-house for one of the company's dark site locations.
What three items can the consultant deliver in closing to help ensure customer's success in deploying and supporting Nutanix clusters?
An administrator is monitoring the Nutanix v5.15-based AOS cluster performance logs and notices that a SQL server VM is greatly exceeding its intended maximum IOPS. The administrator has confirmed that a QoS policy was previously created for the group of VMs this server is a member of.
What are two reasons that this VM would exceed its maximum configured IOPS from the QoS Policy? (Choose two.)
A consultant is preparing for a cluster deployment and evaluates portable Foundation.
Laptop configuration is as follows:
•CPU: 2.8 GHz Quad-Core Intel Core i7
•Memory: 4GB RAM
During the installation, the consultant encounters some errors and tries to troubleshoot.
What could prevent successful installation and Foundation usage?
The installation process stops before imaging any of the nodes and an error message is displayed notifying the IPMI IP address is unreachable.
What should consultant do to fix the issue?
A customer already has a Prism Central (PC) instance deployed in their environment and expects the consultant to unregister the old cluster before registering the new cluster
What steps should the consultant take to safely and successfully unregister the customer's former cluster from PC?
A customer has a mail server and needs Nutanix to send email notifications about errors that might occur in Prism. The following information is included under SMTP Server Settings
◦IP Address of mail server
◦Port Security Mode
◦From email address
What should the consultant set up before arriving onsite?
During the Foundation imaging process, nodes are successfully imaged, but the cluster creation fails.
Which log should the consultant review to determine the cause?
PDF + Testing Engine
|
---|
$57.75 |
Testing Engine
|
---|
$43.75 |
PDF (Q&A)
|
---|
$36.75 |
Nutanix Free Exams |
---|
![]() |