An administrator needs to make sure an RF2 cluster can survive a complete rack failure without negatively effecting workload performance. The current cluster configuration consists of the following:
• 30 nodes: distributed 10 nodes per rack across three 42U rack
• Each nodes is configured with 40TB usable storage all flash (Cluster Total 1.2 PB Usable)
• Current cluster utilization is 900TB storage
Which configuration changes should be made to make sure that the cluster meets the requirements?
Refer to the exhibit.
An administrator configures Active Directory authentication as shown in the exhibit. Upon finishing setup, users are not able to log in.
What configuration change should be made to fix this issue?
After installation, network ports are properly configured with the default active-backup bonding.
One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.
What should the consultant enable to resolve this issue?
An administrator is updating disk firmware using LCM and receives the following message:
“there have been 10 or more cluster services restarts within 15 minutes in the Controller VM”
The message appears as each drive is upgraded.
What is the reason this message is being generated?
An administrator receives an alert in Prism indicating that interface eth2, on an AHV host is receiving many CRC errors. After togging into the problematic host, the following command is run to show the indicated output:
What is causing this issue?
A customer has requested that a consultant create a Disaster Recovery Test for their new Nutanix environments.
What should the consultant include in a custom plan to validate VM availability across the network?
A customer recently set up Async Replication between Site A and Site B. The customer wants to conduct a planned failover and clicks Activate on Site B.
The customer then runs the following command on Site A:
ncli pd deactivate_and__destroy_vms name=
What does this do to the customer environment?
An administrator migrates a VM onto a new Nutanix cluster. After the migration, the administrator observes the following conditions:
• Cluster memory utilization: 64%
• Cluster CPU utilization: 19%
• Cluster storage utilization: 32%
• Average VM CPU utilization: 25%
• Average VM CPU ready%: 24%
• Average VM memory utilization: 60%
Which two changes should the administrator make to improve VM performance? (Choose two.)
An administrator has a VM that consumes large amounts of storage and has the following characteristics:
• Create large / sequential writes
• Data must be kept for years
• Data is normally only accessed at the end of the year to run report
The administrator decides to use Erasure Coding to save space.
Which feature should the administrator utilize to save space for this VM?
Where can a consultant find Nutanix Enablement Starter Packs (ESPs)?