Weekend Sale 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sale65best

Free HP HPE0-S59 Practice Exam with Questions & Answers | Set: 3

Questions 21

Your customer has an HPE Synergy frame equipped with a D3940 Storage Module. Each of the compute nodes has the appropriate storage controller installed and two 12Gb SAS switches installed in the first fabric.

The customer reports that the compute nodes cannot access the storage module.

What will you verify first when troubleshooting this problem?

Options:
A.

If the SAS logical interconnect is a part of the logical enclosure and has a healthy state.

B.

If the D3940 module is imported in a managed state that allows volume provisioning.

C.

If there is at least one iSCSI network configured that will provide access to the module.

D.

If the D3940 storage module is properly licensed through the HPE OneView interface.

HP HPE0-S59 Premium Access
Questions 22

Which statement about the SY480 Gen10 Plus Compute Module is true?

Options:
A.

It cannot be mixed with Gen9 compute modules in the same frame.

B.

It supports 8 memory channels and memory DIMMs of up to 256GB.

C.

It only supports NVDIMM Persistent Memory.

D.

It supports "3rd Gen AMO EPYC Server Processors with 64 cores.

Questions 23

Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.

What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

Options:
A.

A second CPU must be installed for all HPE Synergy 480 Gen10 compute nodes.

B.

For Brocade switches, a logical interconnect group must be created in HPE OneView.

C.

For VC-FC modules, all of server facing ports must be property licensed.

D.

SAS switches must be moved to second fabric and FC modules Installed in the first one.

Questions 24

A junior architect designed a solution based on HPE Synergy that must meet the following requirements:

    Support at least 30 HPE Synergy 480 Gen10 Plus compute modules

    Interconnect modules must provide MAC and WWN virtualization

    All HPE Synergy frames must formulate a single management entity

    The management appliance should not be a single point of failure

    Connectivity to FC array should be available to all compute nodesThe proposal consists of:

    3 HPE Synergy 12000 frames

    6 HPE Composer 2 modules

    2 HPE Virtual Connect SE 100Gb F32 Module

    4 HPE Synergy 50Gb Interconnect Link ModuleWhich statements about this proposed design are true? (Select two)

Options:
A.

FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Module must be added.

B.

HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100Gb F32 modules.

C.

Remove 4 HPE Composer 2 modules from the design, as they are not required.

D.

The selected interconnect modules do not provide the requested WWN virtualization.

E.

The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules.

Questions 25

Your customer has an HPE Synergy platform deployed and managed using HPE OneView. The customer also has HPE Superdome Flex with RMC deployed They plan to deploy a second nPar and HPE Superdome Flex 280 They plan to manage new components using HPE OneView

What must be done to achieve this goal?

Options:
A.

The customer must use IL05 to add HPE Superdome Flex systems to HPE OneView

B.

The customer should deploy an HPE OneView appliance for HPE Superdome Flex management

C.

The customer must add a second Rack Management Controller for HPE Superdome Flex 280

D.

The customer has to add HPE Superdome Flex to the HPE OneView used to manage HPE Synergy

Questions 26

You modified a logical interconnect group mat is used to configure logical interconnects in five different logical enclosures. What will be the impact of that change?

Options:
A.

All physical interconnects from affected logical interconnects will be placed in a maintenance mode

B.

All physical interconnects from the affected logical interconnects must he rebooted to activate the new configuration

C.

All logical interconnects configured using this logical Interconnect group will report inconsistency

D.

All logical interconnects configured using this logical interconnect group will be automatically updated

Questions 27

Your customer is implementing an HPE Synergy solution based on three frames.

Click each of the ports that can be used to connect satellite modules.

HPE0-S59 Question 27

Options:
Questions 28

Your customer plans to manage HPE Primera using HPE Oneview

Which storage management tasks can be completed using HPE OneView for this environment?

Options:
A.

CPG management

B.

Volume provisioning

C.

Cache management

D.

Replication setup

Questions 29

Click the drop-down menu that will allow you to define the location of the master modules within the logical interconnect group.

HPE0-S59 Question 29

Options:
Questions 30

Which compute node parameters are captured within server hardware type?

Options:
A.

Number of the CPUs

B.

installed operating system

C.

Mezzanine card configuration

D.

Size of the memory Installed