Summer Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

Free HP HPE0-S60 Practice Exam with Questions & Answers

Questions 1

As a result of the troubleshooting process, you recommend replacing, HPE Synergy Composer modules which HPE Synergy Composer 2

Why would you recommend this change?

Options:
A.

HPE Composer 1 running HPE OneView 5 2 or later can support only 12 frames within a single management nog

B.

HPE Composer 2 can support more than the maximum 21 frames that are supported with HPE Composer 1 and HPE OneView.

C.

HPE Composer 2 provides access to 105 interface that can be used for full management of HPE Composer 2 remotely

D.

HPE Composer 1 cannot support remote frames, which doubles the configuration and management procedures effort

HP HPE0-S60 Premium Access
Questions 2

What is a limitation when creating a server profile?

Options:
A.

BIOS settings can be changed only when UEFI optimized is selected as boot mode

B.

ILO management is limited to the integration with Active Directory or LDAP

C.

Administrator cannot define more than 8 connections within a server profile

D.

It is not possible to create shared volumes on demand through a server profile

Questions 3

Refer to the exhibit.

HPE0-S60 Question 3

Which statement about this logical interconnect group is true?

Options:
A.

The master modules are located in the interconnect bays 2 and 5

B.

For the given downlink speed, the maximum number of frames is reached

C.

Both master modules are located in the same HPE Synergy frame

D.

To use interconnect bay set 3, all compute nodes must be half-height

Questions 4

Your customer has me following HPE Synergy setup

- Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure

- Two HPE Virtual Connect SE 100Gb F32 Module for Synergy

- Four HPE Synergy 50Gb interconnect Link Module

- Six HPE Synergy Virtual Connect SE 32Gb FC Modules

The customer needs to add a frame.

Which statement about the expansion of this setup is true?

Options:
A.

The additional frame must have HPE Virtual Connect FC modules installed

B.

The customer can grow the existing logical enclosure up to 5 frames

C.

The customer has to create a new logical enclosure for the additional frame

D.

The additional frame cannot have 12Gb SAS connection modules installed

Questions 5

Your customer has the following HPE Synergy setup:

- 15 HPE Synergy 12000 frames with 50Gb connectivity to each server port

- 2 HPE Composer 2 modules

- 15 HPE D3940 Storage Modules, one per frame

- 2 HPE 12Gb SAS switches per frame

Which statement about this setup is true?

Options:
A.

The customer must create at least five logical enclosures for this setup.

B.

To manage 15 frames, additional HPE Composers are required.

C.

The customer can install up to 12 HPE Synergy 480 compute nodes per frame.

D.

If properly cabled, any compute node can access any HPE D3490 storage module

Questions 6

In the past a customer experienced a networking issue where network ports went down and came back up in quick succession.

Which HPE Virtual Connect SE 100 GD F32 Module for HPE Synergy feature can be configured to disable such ports?

Options:
A.

Pause flood protection

B.

sFlow

C.

Storm control

D.

Port flap protection

Questions 7

What is a restriction of using a RoCE network?

Options:
A.

It is by default configured as an untagged network and cannot be a part of a network set.

B.

It does not support Private VLAN and Multicast VLAN.

C.

it is not supported with HPE Virtual Connect SE 40 GD F8 Module for HPE Synergy.

D.

It does not support smart link and private network features.

Questions 8

An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays

Where should you start the troubleshooting process?

Options:
A.

At the iLO interface to verify whether the ILO Advanced license is properly applied

B.

At HPE OneView Interface to verify whether the server is In the maintenance mode

C.

At the iLO interface to verify whether the SSO certificate is removed from an iLO.

D.

At HPE OneView Interface to verify whether the iLO processor is disabled

Questions 9

You plan to configure a Link Aggregation Group (LAG) for two connections within a server profile for a compute node running an ESXI system.

What is required from the VMware side to enable LAG?

Options:
A.

Virtual Distributed Switch

B.

vSphere Standard license

C.

Load balancing cluster

D.

Dedicated VMKernel port

Questions 10

After HPE Superdome Flex deployment and nPar setup, you need to verify health status of HPE Superdome Flex components.

Put the steps on the left into the coned order on the right to perform this task.

Options: