Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70track

Free HP HPE0-S59 Practice Exam with Questions & Answers

Questions 1

Which statement about HPE OneView milestone releases is true?

Options:
A.

A milestone release is a release which must be installed on HPE Composer to support current version of the Service Pack for Synergy

B.

A milestone release is a release that is published when HPE releases new hardware components to immediately support new systems

C.

A milestone release is available for selected partners that give access to HPE OneView features which are not officially announced.

D.

A milestone release is a release with an enhanced update architecture mat is a prerequisite prior to updating to a subsequent release.

HP HPE0-S59 Premium Access
Questions 2

Put the steps of the HPE infosight flow in the correct order.

HPE0-S59 Question 2

Options:
Questions 3

Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.

What should you do to resolve this issue?

Options:
A.

Disable deduplication for this volume at the array level

B.

Remove the offline disks using array management tools

C.

Install and configure MPIO on me Windows system

D.

Remove the offline disks using Windows Disk Management

Questions 4

What is one benefit a customer receives with HPE Tech Care?

Options:
A.

Subscription to OpsRamp for continuous monitoring of their environment

B.

Comprehensive support services for multivendor environments

C.

Access to the Software Dashboard, which shows the latest software versions for all the covered products

D.

A dedicated team of experts who provide personalized support services based on the customer ' s environment

Questions 5

What is one requirement for onboarding HPE servers in HPE Compute Ops Management? Assume that the activation key method will be used.

Options:
A.

Servers have a supported operating system installed on them.

B.

Servers with iLO dedicated network ports use that port, not an iLO shared network port.

C.

Servers serial numbers and product IDs have been added to the HPE GreenLake inventory.

D.

Servers are discovered with HPE OneView.

Questions 6

Your customer with an HPE Synergy environment needs to prevent a timeout and loss of communication during an external switch firmware upgrade.

Which parameter can the customer configure within an uplink set to meet their requirements?

Options:
A.

The customer should set the connection mode to manual.

B.

The customer should disable LACP failover trigger.

C.

The customer should enable LACP load-balancing.

D.

The customer should set LACP timer to long.

Questions 7

Your customer wants to update the firmware for 36 HPE Synergy 480 Gen 10 compute modules with a server profile assigned from a server profile template.

Put the steps required to achieve this goal on the left into their correct order on the right.

HPE0-S59 Question 7

Options:
Questions 8

Refer to Exhibit:

HPE0-S59 Question 8

Your customer plans to update the firmware for the logical interconnect shown.

Based on the information in the exhibit, which statement about network connectivity is true?

Options:
A.

Only the manual orchestration method will allow a firmware upgrade without causing network downtime.

B.

It is possible to update this logical interconnect without network downtime if orchestrated method is used.

C.

Compute nodes will experience network downtime if the Force option is selected, as it will enforce parallel update.

D.

Compute nodes will experience network downtime not longer than 1 minute regardless of the orchestration method.

Questions 9

Match HPE Superdome Flex system with its specific feature.

HPE0-S59 Question 9

Options:
Questions 10

Your customer manages an HPE Synergy platform using HPE OneView 5.6. To leverage new functionalities, the customer wants to update HPE OneView to version 61

Which statement about this update process is true?

Options:
A.

To update to 6,1, the customer has to first update to 6 0, which is a milestone edition.

B.

The customer can update directly to 6,1, but HPE OneView downtime will be longer.

C.

Before updating to 6,1, customer should increase memory size on the HPE Composer.

D.

The customer must check the HPE Composer version, as 61 is supported only with HPE Composer2.