Which of the following terms is often used to describe two parallel paths that have identical conductive terminations to two separate grounding reference points?

Options:
A.

Resistive loop

B.

Ground loop

C.

Capacitive loop

D.

Inductive loop

E.

Conductive loop

BICSI RCDDv14 Premium Access
Questions 82

When sizing an underground entrance facility, what is the MINIMUM amount of 103 metric designator conduits (4 trade size) that should be specified by the ICT distribution design?

Options:
A.

2 Conduits

B.

3 Conduits

C.

4 Conduits

D.

6 Conduits

Questions 83

An ICT distribution designer is designing a backbone cabling network that is specified for a campus network including several links approaching 2000 m (6562 It) and data rates of 100 Gb/s What optical fiber type(s) should be used?

Options:
A.

OM3 fiber

B.

OM4 fiber

C.

Both OS1 and OS2 fiber

D.

Both OS2 and OM3 fiber

Questions 84

A global enterprise resource planning (ERP) program's scope includes designing and building a global template. Plans include a pilot implementation project to validate the template, to be followed by several rollout projects. During the build of the global template, a new government regulation mandates implementation of a goods and services tax (GST).

What should the program manager update?

Options:
A.

Program communications management plan

B.

Benefits management plan

C.

Stakeholder engagement plan

D.

Benefits transition plan

Questions 85

Who prepares the submittals that are reviewed and approved to ensure that the clients design criteria is met in regards to material selection?

Options:
A.

General Contractor

B.

ICT distribution designer

C.

Client

D.

Architect. Engineering, Consultant Team

Questions 86

A program manager concurrently implements a software program at four client locations. The client's objective is to maintain quality while shortening the software implementation timeline

What key elements should be included in the benefits register to achieve this goal?

Options:
A.

Plans for tracking and communicating risks associated with the program

B.

Plans for conducting program quality assurance and control on a regular basis

C.

Plans for program schedule control to meet the shorter timeline

D.

Plans for defining metrics and key performance indicators (KPIs), and procedures to measure benefits

Exam Code: RCDDv14
Certification Provider: BICSI
Exam Name: BICSI Registered Communications Distribution Designer – RCDDv14
Last Update: Jul 13, 2025
Questions: 288