Free The Open Group OG0-093 Practice Exam with Questions & Answers | Set: 4

Questions 31

Which part of the TOGAF standard provides a full description of each architecture phase?

Options:
A.

Architecture Capability Framework

B.

Architecture Development Method

C.

ADM Guidelines and Techniques

D.

Enterprise Continuum & Tools

The Open Group OG0-093 Premium Access
Questions 32

Which of the following best describes the Reference Library within the Architecture Repository?

Options:
A.

Guidelines and templates used to create new architectures

B.

Processes to support governance of the Architecture Repository

C.

A description of the organization specific architecture framework and method

D.

Specifications to which architectures must conform

E.

A record of the governance activity across the enterprise

Questions 33

Complete the sentence.

A good set of architecture principles that cover every situation perceived throughput the enterprise meet the recommended criteria of____

Options:
A.

understandability

B.

consistency

C.

stability

D.

completeness

E.

robustness

Questions 34

Please read this scenario prior to answering the question

Your role is that of an Enterprise Architect in a multinational automotive and clean

energy company. The company designs and manufactures electric vehicles, battery

storage, and solar panels. The company has multiple manufacturing facilities, in North

America, Europe, and in Asia. Most of the facilities are wholly owned by the company,

but two in Asia are jointly owned with local partners.

The company has a mature Enterprise Architecture practice that is supported by a

cross-functional Architecture Board. The TOGAF standard is used for developing the

automated manufacturing process and systems used to design, manufacture and test

the new design. The Chief Information Officer and the Chief Operating Officer co-

sponsor the Enterprise Architecture program.

A challenge that the company is facing is to scale up the number of vehicles coming

off the production lines to meet customer demand. At the moment there are supply

chain shortages for key custom-designed electronic components used in the vehicles.

In response to this, the research arm of the company has pioneered the development

of a revised design using common off-the-shelf components that will allow for a

significant increase in overall vehicle production. This new design is ready to go into

production.

As part of putting the new design into production, adjustments to the automated

assembly processes need to be made. A pilot architecture project at a single location

has defined an updated approach for controlling the automated systems used to

perform final assembly and quality assurance. The Chief Engineer, sponsor of the

activity, and the Architecture Board have approved the plan for immediate

implementation at each plant.

Architecture Contracts have been developed that detail the work needed to implement

and deploy the new automated system controller for each location. The Chief

Engineer has expressed concern that a uniform process be employed at each location

to ensure consistency and quality.

Refer to the Scenario

You have been asked to recommend the best approach to address the Chief

Engineer's concern.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:
A.

You would use the Architecture Contracts to manage the architecture

governance processes for the project across the locations. You would ensure

that the quality of each completed vehicle at each location is assessed, and

any local change requirements identified, if necessary. You recommend that if

a deviation from the contract is detected, the Architecture Board should modify

the Architecture Contract to allow

B.

You would review the Architecture Contract for each location, ensuring that it

addresses the project objectives, effectiveness metrics, acceptance criteria,

and risk management. Where applicable, you ensure that the contract is legally

enforceable. You would schedule compliance reviews at key points in the

assembly and quality assurance process to ensure that the work is proceeding

in accordance with the Archit

C.

You would create an Architecture Contract to manage and govern the

implementation and migration process at each location. For wholly owned

facilities, you issue a memorandum of understanding between the Architecture

Board and the implementation organization. For facilities jointly owned by local

partners, you would ensure that the contract is legally enforceable. You would

then ensure that the Architecture Boar

D.

You would create an Architecture Contract to govern the update to the

automated system controller at each location. For facilities managed by

partners, you ensure that it is a fully enforceable legal contract, and you would

schedule additional compliance reviews at key points in the assembly and

quality assurance process. These additional reviews would be for an initial

period until no deviations from the contr

Questions 35

Scenario

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for an enterprise architecture project team within a leading multinational pharmaceutical and medical devices manufacturer. Its brands include numerous household names for medications and first aid supplies.

The company has a long history of innovating new treatments for many common illnesses and diseases. Prior to launching a new treatment, the company has to demonstrate Its effectiveness and safety in a set of clinical trials that satisfy the regulatory requirements of the countries in the target markets. All clinical trials are undertaken by its research laboratories, which employ over 10,000 people at separate facilities in the United Kingdom, United States, Sweden, France, Canada, India, China and Japan. In addition to internal research and development activities the company is also involved in publicly funded collaborative research projects, with other industrial and academic partners.

The Enterprise Architecture group within the company has been engaged in an architecture development project to create a secure networked collaboration system that will allow researchers at its product development laboratories worldwide to share information about their clinical trials. This system will also connect with external partners.

The Enterprise Architecture group within the company has been engaged in an architecture development project to create a secure networked collaboration system that will allow researchers at its product development laboratories worldwide to share information about their clinical trials. This system will also connect with external partners.

The Enterprise Architecture group is a mature organization. They use the TOGAF 9 ADM with extensions required to support current good manufacturing practices and good laboratory practices in their target markets. Due to the highly sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant.

The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. She has stated that the changes to the enterprise architecture for the new system will need to be rolled out in stages on a regional basis that minimizes disruptions to ongoing clinical trials.

Refer to the Scenario

You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture(s).

Based on TOGAF, which of the following is the best answer?

Options:
A.

Determine the set of Solution Building Blocks required by identifying which Solution Building Blocks need to be developed and which need to be procured. Eliminate any duplicate building blocks. Group the remaining Solution Building Blocks together to create the work packages using a CRUD matrix. Rank the work packages in terms of cost and select the most cost-effective options for inclusion in a series of Transition Architectures. Schedule

B.

Create an Implementation Factor Assessment and Deduction Matrix and a Consolidated Gaps, Solutions and Dependencies Matrix. For each gap, identify a proposed solution and classify it as new development, purchased solution, or based on an existing product. Group similar solutions together to form work packages. Identify dependencies between work packages factoring in the clinical trial schedules. Regroup the packages into a set of Capability

C.

Group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work packages. Using the matrix as a planning tool, regroup the work packages to account for dependencies. Sequence the work packages into the Capability Increments needed to achieve the Target Architecture. Schedule the rollout one region at a time. Document the progression of the enterprise architecture using a state evolution tabl

D.

Use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap classify whether the solution is either a new development, purchased solution, or based on an existing product. Group the similar solutions together to define the work packages. Regroup the work packages into a set of Capability Increments to transition to the Target Architecture taking into account the schedule for clinical trials.

Questions 36

Scenario:

Please read this scenario prior to answering the question

Your role is that of the Lead Enterprise Architect at a multinational automotive corporation. The company is headquartered in Germany, and manufactures cars, trucks and buses. It has manufacturing plants across North America, South America, Europe and Asia. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company has an ongoing initiative to improve the efficiency of all of its production operations, and in particular to reduce its carbon footprint. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in energy usage could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in one central data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities.

The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF standard.

At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the global CIO. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The architecture project team has now been formed, and has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their planning and production scheduling from a remote centralized system. The CIO wants to know how these concerns can be addressed. During the initial project team meeting a number of alternative recommendation for how to proceed have been put forward by members of the team.

Refer to the Scenario

You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.

Based on the TOGAF standard, which of the following is the best answer?

Options:
A.

The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier list. Based on the findings from the research, the tam should define a preliminary Architecture Vision. The team should then use that model to build consensus among the key stakeholders.

B.

The team should identify the individuals and groups within the organization who will contribute to the project in order to understand who has concerns about the initiative. The team should then hold a series of interviews at each of the manufacturing plants using the business scenario technique. This will then enable them to identify and document the key high-level stakeholder requirements for the architecture.

C.

The team should utilize its approved supplier list, and conduct a pilot project that will enable those suppliers to demonstrate potential solutions that will address the concerns of the stakeholders. Based on the findings of that pilot project, a complete set of requirements will be developed that will drive the evolution of the architecture.

D.

The team should perform a shallow architecture development iteration, developing Baseline and Target Architecture for each of the manufacturing plants. This should include development of a set of views corresponding to selected viewpoints that address key concerns of the stakeholders. A consolidated gap analysis between the architectures will then be used to validate the approach and determine the capability increments needed to achieve the

Questions 37

Please read this scenario prior to answering the question

Your role is consultant to the Lead Enterprise Architect within a multinational manufacturing company. The company has several manufacturing divisions.

The company has a mature Enterprise Architecture practice and uses the TOGAF standard as the basis of Its architecture frame work. In conjunction with the EA program, the company uses several management frameworks. Including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.

The company has defined a strategic architecture to improve ils ability to meet customer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple applications that have been operating independently in the divisions' production facilities. The goal is to replace the functionality of the existing applications with a new application running as a single instance in the company’s primary data center.

Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufactunng requirements.

The key corporate change attributes and implementation constraints have been confirmed. The gap analysis results have been consolidated and integrated, which has identified the gaps across the Business, Data. Application, and Technology domains. The requirements, dependencies and interoperability requirements needed to integrate the new application have been reviewed, consolidated, and validated. The Business Transformation Readiness Assessment started in Phase A has been completed. The risks associated with the transformation effort have been identified, classified, mitigated for, and documented. The Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables have been completed.

Because of the risks posed by the complexity of the current environment. It has been determined that a phased approach is needed to implement the target architectures. The overall implementation process Is estimated to take several years.

Refer to the Scenario

You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.

Based on the TOGAF Standard. Version 9.2. which of the following is the best answer?

Options:
A.

You recommend that the Architecture Definition Document is finalized and placed under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. An Implementation Governance Model should be produced to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture. The final Implementation and Migration P

B.

You recommend an assessment is made to determine how the plan impacts the other frameworks in use In the organization. If the plan impacts them, then coordination will be required. The business value should then be assigned to each work package, and projects identified for inclusion In the plan, taking Into account available resources and prionties for the projects. The details for the plan should be gathered together and the final Implemen

C.

You recommend that the criteria of business value rs applied to prioritize the implementation projects and project increments. This should focus on the return-on-investment criteria as signed off by the stakeholders, and the performance evaluation criteria used to monitor the progress of the architecture transformation. The Transition Architecture phases should be confirmed using an Architecture Definition Increments Table to list the proje

D.

You recommend that the migration planning outputs are reviewed, and recommendations are produced for the solution development. The priorities, high-level migration strategy, and resources needed should be identified for the development team. The requirements for monitoring tools, and the performance targets for the implementation should be documented. All this information should be gathered and the final Implementation and Migration Plan ge

Questions 38

Scenario:

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for the enterprise architecture team at the prime contractor for the Dreadnought Unmanned Aircraft System program.

Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. The decision has been made to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.

TOGAF 9 Is used for internal Enterprise Architecture activities, with an iterative approach for executing Architecture Development Method (ADM) projects.

At present, there are no particularly useful architectural assets related to this initiative, so all assets need to be acquired and customized or created from scratch. The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving existing processes or systems.

The architect-re development project has put in place Its Architecture Capability for this project and has started a number of iteration cycles to develop the Architecture. Some tasks to address concerns related to the Business Architecture have been completed. The next immediate task is to address the Information Systems Architectures.

The Information Systems Architectures must address stakeholder concerns such as:

1. Which procurement-related business processes are supported by zero, one, or many existing applications?

2. What non-procurement applications will need to be integrated with any new procurement applications?

3. What data will need to be shared?

Refer to the Scenario

[Note: You may need to refer to TOGAF 9 Chapter 35 in order to answer this question.]

You have been asked to identify the most appropriate catalogs, matrices, and diagrams for this situation.

Based on TOGAF 9, which of the following is the best answer?

Options:
A.

in the early iterations of Architecture development, you would describe the Baseline Application Architecture with a System/Function matrix, and describe the Baseline Data Architecture using a Data Entity/Data Component catalog. In the later Iterations of the Architecture Definition, you would describe the Target Application Architecture using Application Communication diagrams and an Application Interaction matrix, and describe the Target

B.

In the early iterations of Architecture development, you would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix, and describe the Target Data Architecture with a System/Data matrix. In the later iterations of Architecture development, you would describe the Baseline Application Architecture with an Application and User Location diagram and a System/Function matrix, an

C.

In the early iterations of Architecture development, you would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix, and describe the Target Data Architecture with a Data Entity/Business Function matrix and a System/Data matrix. In the later iterations of Architecture development, you would describe the Baseline Application Architecture with a System/Function matrix, and

D.

In the early iterations of Architecture development, you would describe the Baseline Application Architecture with a Technology Portfolio catalog, and describe the Baseline Data Architecture with a Data diagram. In the later iterations of Architecture development, you would describe the Target Application Architecture with a System/Technology matrix, and describe the Target Data Architecture with a Data Dissemination diagram.

Questions 39

Which of the following describes an objective of the Preliminary Phase?

Options:
A.

Ensure conformance requirements for the target architecture are defined

B.

Develop the Implementation and Migration Plan

C.

Operate the governance framework

D.

Establish the architecture governance processes

E.

Develop the Architecture Vision document

Questions 40

Scenario:

Please read this scenario prior to answering the Question

You have been assigned the role of Lead Enterprise Architect for a manufacturing firm that specializes in musical instruments. The firm has been established for over 100 years, operating in North America for most of that time. In the last ten years, the firm has expanded into European markets and will soon establish a market in Latin America. A future expansion into the Asia Pacific region is also planned.

The firm is organized into several business units that each focus on manufacturing particular families of instruments such as brass, woodwind, and percussion. Each business unit has acquired other producers to expand its manufacturing capacity. This has resulted in a complex environment with a high diversity of business and manufacturing systems.

The Enterprise Architecture (EA) program within the firm has been functioning for several years. It has made significant progress in consolidating the technology portfolio and establishing key standards. The CIO and the COO are pint sponsors of the EA program. The EA program is mature, with an active Architecture Board and a well-defined architecture process and standard content templates based on the TOGAF 9 Architecture Content Framework. The EA process framework is well coordinated with the PMO, Systems Development, and Operations functions.

The firm has completed a strategic plan to reorganize its Sales & Marketing organization according to the four target geographic markets. One of the goals of this reorganization is to improve the ability of Marketing to collect more meaningful market analytics that will enable each sector to better address market needs with effective marketing campaigns and global product presence.

A Request for Architecture Work to address the goals of the reorganization has been approved. As the architecture team commences its work, the CIO has expressed concerns about whether the firm will be able to adapt to the proposed architecture and how to manage the associated risks.

Refer to the Scenario

You have been asked how to address the concerns of the CIO.

Based on TOGAF 9, which of the following is the best answer?

Options:
A.

In Phase B, the team should create a set of views that will enable them to identify the factors that will influence the successful introduction of the architecture into the organization. There should then be an assessment of each factor on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fix. These factors can then be used to assess the initial risks associated with the proposed architec

B.

In Phase A, the team should analyze their risk by completing an Implementation Factor Assessment and Deduction Matrix to identify the particular risks associated with the implementation and deployment. The matrix should include a list of factors to be considered, their descriptions, and constraints that should be taken into account. These factors can then be used to assess the initial risks associated with the proposed architecture.

C.

In Phase A, the team should use the Business Transformation Readiness Assessment technique to identify the factors that will influence the successful introduction of the architecture into the organization. The assessment should include determining the readiness rating for each factor based on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fix. These factors can then be used to assess t

D.

In Phase A, the team should conduct a Business Scenario to identify the stakeholders' concerns and the resulting retirements. Once the retirements have been identified, they can be assessed in terms of their risks. The risks should be evaluated in terms of how they could be avoided, transferred, or mitigated. Any risks that cannot be resolved should be identified as residual risks and their disposition should be decided by the Architecture