Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70track

Free Pure Storage FlashArray-Implementation-Specialist Practice Exam with Questions & Answers | Set: 4

Questions 31

What are the interface names for a 4-port FC card in slot 1 in an XR2/3 array?

Options:
A.

FC0, FC1, FC2, and FC3

B.

FC4, FC5, FC6, and FC7

C.

FC5, FC6, FC7, and FC8

Pure Storage FlashArray-Implementation-Specialist Premium Access
Questions 32

During a deployment, an Implementation Engineer attempts to name a FlashArray corporate Lab-0L, but the array rejects the name. What is the reason for the failure?

Options:
A.

FlashArray names cannot include hyphens.

B.

FlashArray names cannot include numbers.

C.

FlashArray names cannot contain spaces.

Questions 33

Which user does an Implementation Engineer use when preparing for the Purity upgrade to complete a HWNDU?

Options:
A.

pureuser

B.

puresetup

C.

pureinstall

D.

root

Questions 34

Which PCI cards must be validated on the Bill of Materials (BOM) to allow an Implementation Engineer to attach a DirectFlash Shelf to a FlashArray//XL130R5?

Options:
A.

FA-XL-100G Ethernet/RoCE 2-Port CX6

B.

FA-XL-100G iSCSI/RoCE 2-Port CONNECTX-5

C.

FA-XL-200G Ethernet/RoCE 2-Port CX7

D.

FA-XL-25G Ethernet/RoCE 4-Port CX6

Questions 35

An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs. What should the Implementation Engineer do to get the array using a 20-module Wide write group?

Options:
A.

Install the four new DFMDs and run puredrive .

B.

Work With the account team to Ship DFMS instead Of the DFMDS.

C.

Install the four new DFMDs, run puredrive admit and have support set the tunable puretune --set ALLOW_DFMD_IN_DFM_WWG 1

Questions 36

An Implementation Engineer is performing a capacity consolidation on an X50R2 that is 83% full. The starting config is X50R2-20/10-22/0. The end config is X50R2-91/0. What steps should the Implementation Engineer follow to complete the work?

Options:
A.

Evac the chasses drives, install the new 91TB chassis data pack, and evac SH0.

B.

Move the 20TB chassis DP to SH0, install the new 91TB chassis DP, evac the 10TB chassis DP, and evac SH0.

C.

Evac SH0, evac the 20TB chassis DP, install the new 91TB DP, and evac the 10TB chassis DP.

Questions 37

A customer has purchased a DirectFlash Shelf, but lacks available space in the same rack as the chassis. There is available space in a rack 6m away. What step should be taken prior to implementation?

Options:
A.

Make space in the rack where the chassis is located.

B.

Order 7m DirectFlash Shelf cables.

C.

Relocate the chassis to the rack where there is space for the shelf.

Questions 38

A customer would like to reduce SafeMode settings for retention and eradication with their current policy. How is authorization obtained to make the requested changes?

Options:
A.

A Pure1 Admin needs to approve any changes for Pure Support to proceed.

B.

Two SafeMode approvers need to acknowledge via Pure1 step-up authentication before any changes can be made.

C.

The local account on FlashArray needs to permit any local changes.

Questions 39

Which PCIe slot supports 4-port FC cards on FlashArray//XL?

Options:
A.

2

B.

5

C.

8

Questions 40

After racking a new FlashArray with one data pack, how should DirectFlash modules be installed?

Options:
A.

Starting in bay 10, left to right.

B.

Starting in bay 0, left to right.

C.

Starting in bay 19, right to left.

D.

Starting in bay 4, left to right.