An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. Which ports should the Implementation Engineer use for the connection?
On FlashArray//XL, which slots support a 4-port FC card?
What are the default replication ports on all three rack unit FlashArray models?
An Implementation Engineer has completed a hardware NDU, but after the upgrade, Purity reports a "health not responding" status when running status. Before contacting support, which command should the Implementation Engineer run to review a list of possible logged issues?
Which cards are required to connect a DirectFlash Shelf to an FlashArray//XLR5?
Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?
During a FlashArray//X to FlashArray//XL hardware upgrade, when should the Implementation Engineer insert the DFMd modules into the FlashArray//XL?
An Implementation Engineer is installing a FlashArray//XL chassis with two DirectFlash Shelves. What is the minimum rack space required for this installation?
An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array. What is the required service depth clearance for the front and rear panels Of the FlashArray//XR4?
If drives need to be relocated within an array for an XFORM upgrade, when should this be completed?
|
PDF + Testing Engine
|
|---|
|
$49.5 |
|
Testing Engine
|
|---|
|
$37.5 |
|
PDF (Q&A)
|
|---|
|
$31.5 |
Pure Storage Free Exams |
|---|
|