Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70track

Free Pure Storage FlashArray-Implementation-Specialist Practice Exam with Questions & Answers | Set: 3

Questions 21

An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. Which ports should the Implementation Engineer use for the connection?

Options:
A.

ETH 10/11

B.

ETH 0/1

C.

ETH 18/19

Pure Storage FlashArray-Implementation-Specialist Premium Access
Questions 22

On FlashArray//XL, which slots support a 4-port FC card?

Options:
A.

5 and 8

B.

3 and 8

C.

2 and 8

Questions 23

What are the default replication ports on all three rack unit FlashArray models?

Options:
A.

ETH2 and ETH3

B.

ETH4 and ETH5

C.

ETH0 and ETH1

Questions 24

An Implementation Engineer has completed a hardware NDU, but after the upgrade, Purity reports a "health not responding" status when running status. Before contacting support, which command should the Implementation Engineer run to review a list of possible logged issues?

Options:
A.

puremessage list --open --hidden

B.

purearray diagnose --log

C.

purealert watcher list

Questions 25

Which cards are required to connect a DirectFlash Shelf to an FlashArray//XLR5?

Options:
A.

2-Port 100GbE iSCSI/RoCE

B.

2-Port 50GbE

C.

2-port 200GbE Ethernet/RoCE

Questions 26

Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?

Options:
A.

pureboot list

B.

cobalt_check.py

C.

purehw list

Questions 27

During a FlashArray//X to FlashArray//XL hardware upgrade, when should the Implementation Engineer insert the DFMd modules into the FlashArray//XL?

Options:
A.

After booting the FlashArray//XL into shelf mode

B.

As part of initial install before power-on

C.

Immediately following the purity software upgrade

Questions 28

An Implementation Engineer is installing a FlashArray//XL chassis with two DirectFlash Shelves. What is the minimum rack space required for this installation?

Options:
A.

9U

B.

11U

C.

12U

Questions 29

An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array. What is the required service depth clearance for the front and rear panels Of the FlashArray//XR4?

Options:
A.

Front panel: 216 mm (8.5 in.), Rear panel: 530 mm (20.9 in.)

B.

Front panel: 530 mm (20.9 in.), Rear panel: 216 mm (8.5 in.)

C.

Front panel: 530 mm (20.9 in.), Rear panel: 530 mm (20.9 in.)

Questions 30

If drives need to be relocated within an array for an XFORM upgrade, when should this be completed?

Options:
A.

During the upgrade

B.

After upgrade is completed

C.

The following day