A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support. What action should the customer take?
The Customer’s Implementation Workbook specifies that the SMTP reply is “outlook.microsoft.com:587”. What correction should be made for array initialization to be successful?
Which ports are used by default for replication on a FlashArray//XR4?
An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversion Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?
Which user does an Implementation Engineer use when preparing for the Purity upgrade to complete a HWNDU?
When using FA File, where can the Implementation Engineer manage directories?
Which command should the Implementation Engineer run to verify that Remote Assist is working properly?
An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU. At what step should the Implementation Engineer contact support for assistance?
An Implementation Engineer is beginning a controller upgrade. Which command should be run to stop Purity?
After running puredb run giveback --safe command once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?
|
PDF + Testing Engine
|
|---|
|
$49.5 |
|
Testing Engine
|
|---|
|
$37.5 |
|
PDF (Q&A)
|
|---|
|
$31.5 |
Pure Storage Free Exams |
|---|
|