Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies requires a project building to employ permanent entryway systems. How long must the entryway system be in the primary direction of travel?
What calculation is used to achieve Materials and Resources Credit, Purchasing - Ongoing?
What information regarding a lamp is required to comply with Materials and Resources Credit, Purchasing - Lamps?
Which of the following scenarios contributes towards the achievement of Indoor Environmental Quality Credit, Daylight and Quality Views, Option 2. Quality Views?
What is the required frequency for conducting a waste stream audit in maintaining a high-performing solid waste management program?
The intent of the Energy and Atmosphere Credit, Enhanced Refrigeration Management is to reduce ozone depletion and support early compliance with the
Using the following table, the number of cooling tower cycles in Water Efficiency Credit, Cooling Tower Water Use is determined by which five parameters in the rating system?(Click on Exhibit)
A project is ineligible for an ENERGY STAR® Rating and will document Energy and Atmosphere Prerequisite,
Minimum Energy Performance by benchmarking against historical data. If the performance period calendar year is
2022, which of the following is an acceptable historical baseline?
What is the diversion percentage of ongoing consumables in order to achieve exemplary performance as specified in Materials and Resources Credit, Solid Waste Management - Ongoing?
PDF + Testing Engine
|
---|
$66 |
Testing Engine
|
---|
$50 |
PDF (Q&A)
|
---|
$42 |
USGBC Free Exams |
---|
![]() |