A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be

submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning -

Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?

Options:
A.

Cx program overview, project team members, and process activities

B.

Energy Use Breakdown, project team members, and Capital Improvements Measures

C.

Low and No Cost Improvements, Energy Use Breakdown, and Capital Improvements Measures

D.

Cx process activities, Water efficiency optimization strategies, and Energy Use Breakdown

USGBC LEED-AP-O+M Premium Access
Questions 22

A cafeteria purchases $325.00 USD worth of United States Department of Agriculture (USDA) Organic Certified produce from a farm located 50 mi. (80 km) from the project building during the performance period. What is the maximum allowable value for this purchase that can be claimed towards Materials and Resources Credit, Purchasing- Ongoing?

Options:
A.

$0.00 USD

B.

$162.50 USD

C.

$325.00 USD

D.

$650.00 USD

Questions 23

In which of the following ways can a campus project using a Group Approach comply with Water Efficiency

Prerequisite, Building-Level Water Metering?

Options:
A.

Meter water use for each building separately; meter outdoor water use for the associated grounds

B.

Meter water use for the entire campus (buildings and the associated grounds) using a single meter

C.

Meter water use for all buildings aggregately with a single meter; outdoor water use for the associated grounds

does not need to be metered

D.

Meter water use for all buildings aggregately with a single meter; meter outdoor water use for the associated

grounds

Questions 24

Which of the following is an environmentally friendly technology for controlling erosion?

Options:
A.

Mulching

B.

Laying asphalt

C.

Laying tarpaulin material

D.

Spraying water to contain dust

Questions 25

In order for a project team to meet the requirements of Indoor Environmental Quality Credit, Integrated Pest Management, how much advanced notice to building occupants is needed after the emergency application of a pesticide other than the least toxic pesticide?

Options:
A.

12 hours

B.

24 hours

C.

48 hours

D.

72 hours

Questions 26

A property manager is evaluating various bids from pest management services. Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?

Options:
A.

GreenPro, Ecowise, Greenshield

B.

Quality Pro, Ecowise, Greenshield

C.

San Francisco Tier 3, CRI, Green Seal

D.

Green Seal, San Francisco Tier 3, QualityPro

Questions 27

Which of the following is the most appropriate use of untreated stormwater?

Options:
A.

Irrigation

B.

Boiler water makeup

C.

Drinking fountain

D.

Cooling water makeup

Questions 28

What is the percentage range of total municipal waste that commercial and institutional buildings typically account

for?

Options:
A.

25% to 35%

B.

35% to 45%

C.

45% to 55%

D.

55% to 65%

Questions 29

Which of the following products qualifies under Materials and Resources Credit, Purchasing - Ongoing?

Options:
A.

A product labeled Sustainable Sourced

B.

An organic product produced within a 500 mi. (805 km) radius

C.

A United States Department of Agriculture (USDA) organic food product

D.

A Protected Harvest certified product purchased outside the performance period

Questions 30

A building owner wishes to provide better Indoor Environmental Quality to the building occupants while containing capital costs. The LEED AP suggests pursuing Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Filtration. However, the existing HVAC system was not designed to accommodate the required filters but is otherwise efficient and operating well. Which strategy would enable credit achievement?

Options:
A.

Balance the existing HVAC system

B.

Increase fan capacity to maintain air delivery despite the added resistance

C.

Decrease fan capacity to maintain air delivery despite the added resistance

D.

Replace the existing HVAC system with an air handler that can accommodate the filters

Exam Code: LEED-AP-O+M
Certification Provider: USGBC
Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Last Update: Jul 10, 2025
Questions: 166

USGBC Related Exams

How to pass USGBC LEED-Green-Associate - LEED Green Associate Exam Exam
How to pass USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED AP BD+C) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-ND - LEED AP Neighborhood Development (LEED ND) Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.