Weekend Sale 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sale65best

Free UiPath UiPath-TAEPv1 Practice Exam with Questions & Answers | Set: 3

Questions 21

When creating a new test set in UiPath Orchestrator, what is the purpose of using a wildcard symbol (*) for the project version?

UiPath-TAEPv1 Question 21

Options:
A.

The latest project version starting with 1.0. will be used.

B.

A validation error will be displayed after clicking on the Next button.

C.

The first project version starting with 1.0. will be used.

D.

Any project version starting with 1.0. will be used.

UiPath UiPath-TAEPv1 Premium Access
Questions 22

What can the Clipboard data field be used for in the manual steps of a test case?

Options:
A.

Storing the login credentials for the application under test.

B.

Capturing the state of the application under test at the time of test case execution.

C.

Saving the output of the test case for future use.

D.

Defining a Clipboard value to avoid manually typing into the input fields.

Questions 23

Where are Postman collection endpoint activities found after being imported into a Studio library?

Options:
A.

In the Projects tab, under the namespace of the imported Postman collection.

B.

In the Activities tab, under the namespace that you have set.

C.

In the Debug tab, within the testing activities pack.

D.

In the Activities tab, under the Postman imported libraries list.

Questions 24

How does the licensing model work for Testing runtimes in UiPath?

Options:
A.

It counts the total number of licenses available and divides them amongst the Testing robots.

B.

It counts the maximum number of Testing robots that are able to execute tests simultaneously, given by the total number of runtimes allocated to all the online machines.

C.

It counts the individual testing robots on a machine and assigns each of them an equal number of licenses.

D.

It works by allocating a fixed number of licenses per testing robot, regardless of the maximum number that can execute tests simultaneously.

Questions 25

How can the test data queue items be uploaded to a queue?

Options:
A.

Only through Orchestrator.

B.

Directly in Orchestrator or through Test manager.

C.

Only through Studio.

D.

Directly in Orchestrator or through Studio.

Questions 26

What type of data can be added to the Tester Comment field?

Options:
A.

Text and Screenshot

B.

Text and documents

C.

Text and Video recording

D.

Only text

Questions 27

According to best practices, how should the renaming, moving, or deleting of test cases in the project be handled?

Options:
A.

Test cases should be renamed or moved outside of Studio and then re-imported.

B.

Do not rename move or delete the test cases outside of Studio.

C.

The renaming, moving or deleting of test cases can be handled either inside or outside Studio, there is no preferred way.

D.

Test cases can be renamed, moved or deleted outside of Studio.

Questions 28

Which component of the UiPath Test Suite communicates directly with CI/CD pipelines?

Options:
A.

UiPath Studio

B.

UiPath Action Center

C.

UiPath Orchestrator

D.

UiPath Test Manager

Questions 29

Consider the following snippet:

UiPath-TAEPv1 Question 29

What should be improved to ensure the Test Case will not fail with exception?

Options:
A.

In the Verification point '_autogenerated_TextString' should be removed.

B.

The ObjectRepository should be changed so all the elements fall into Home screen.

C.

The ApplicationPath should be provided dynamically.

D.

Click 'OK' should be removed.

Questions 30

Given the following SumWorkflow:

UiPath-TAEPv1 Question 30

What is the appropriate verification required for testing that the SumWorkflow works as expected?

UiPath-TAEPv1 Question 30

Options:
A.

"sum = expectedSum"

B.

sum

C.

no1 + no2 = expectedSum

D.

sum.Equals(expectedSum)

Exam Code: UiPath-TAEPv1
Certification Provider: UiPath
Exam Name: UiPath Test Automation Engineer Professional v1.0 Exam
Last Update: Jul 12, 2025
Questions: 110