
Refer to the exhibit Users report that calls to toll-free numbers that start with 800 are fatting Calls to other toll-free prefixes such as 866 complete without issue. Which configuration change resolves the issue?
An administrator set up Cisco UCM LDAP Directory and already synced the users to Cisco UCM from the Active Directory, but they forgot to set up feature group templates when. doing the import. Which action resolves the issue?
An administrator is configuring Entra ID synchronization with Cisco Webex Control Hub using SCIM Which two actions must be taken to enable user synchronization and attribute mapping? (Choose two.)
An engineer is configuring a phone system CISCO UCM and wants to activate TFTP service. The engineer selects the serviceability page for configuration. Which nodes configurable for TFTP?
What is a function of a call handler in Cisco Unity Connection?
What are two features of Cisco Expressway that the customer gets if Expressway-C and Expressway-E are deployed?(Choose two.)
What is a capability of the call forwarding feature in a Cisco Webex dial plan?
An engineer is experienci ng congestion on the network for voice and wants to configure QoS. Ten percent of the Low Latency Queue is assigned to the voice to ensure a stable voice service Where does the engineer make this configuration ?
An administrator executes the debug isdn q931 command while debugging a failed call. After a test call is placed, the logs return a disconnect cause code of 1. What is the cause of this problem?
-
Guidelines
-
This is a lab item in which tasks will be performed on virtual devices.
• Refer to the Tasks tab to view the tasks for this lab item.
• Refer to the Topology tab to access the device console(s) and perform the tasks.
• Console access is available for all required devices by clicking the device icon or using the tab(s) above the console window.
• All necessary preconfigurations have been applied.
• Do not change the enable password or hostname for any device.
• Save your configurations to NVRAM before moving to the next item.
• Click Next at the bottom of the screen to submit this lab and move to the next question.
• When Next is clicked, the lab closes and cannot be reopened.
Topology

Tasks
-
The operations team started configuring network devices for a new site.
Complete the configurations to achieve these goals:
1. Ensure that port channel Po1 between DISTRO-SW01 and DISTRO-SW02 is operational using the LACP protocol. Configuration changes for this task must be made on DISTRO-SW01.
2. Ensure that traffic on VLAN 10 is carried as untagged traffic between DISTRO-SW01 and DISTRO-SW02.
3. Complete the Rapid-PVST+ configuration on DISTRO-SW2 by ensuring it it the secondary root switch for all VLANs in the range of 1 to 1005.
DISTRO-SW01



DISTRO-SW02
-


|
PDF + Testing Engine
|
|---|
|
$45 |
|
Testing Engine
|
|---|
|
$35 |
|
PDF (Q&A)
|
|---|
|
$30 |
Cisco Free Exams |
|---|
|