Summer Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70track

Free Cisco 300-110 Practice Exam with Questions & Answers | Set: 2

Questions 11

A customer has a Cisco wireless network that supports VoWLAN services. The customer wants supported voice clients to receive roaming recommendations and suggestions from APs. This functionality must not impact non-VoWLAN clients. What should be enabled on the VoWLAN SSID?

Options:
A.

802.11k neighbor lists

B.

CCKM with 802.1X

C.

802.11v BSS Transition Management

D.

802.11r Fast Transition

Cisco 300-110 Premium Access
Questions 12

An engineer is performing a passive survey report. The coverage heat map shows the entire site with all signal levels. To see only the desired coverage, which action must the engineer take?

Options:
A.

Change the color scheme to show the desired heat map.

B.

Use the RSSI calibration tool to configure the receiver sensitivity.

C.

Use the RSSI slider to set the heat map to the desired cutoff filter.

D.

Filter the results to show the desired APs only.

Questions 13

A wireless network consists of two IOS XE controllers installed in a data center, 9100 series APs, and a corporate and a guest WLAN. The customer must have a high availability pair of two Cisco WLCs for the client SSO. Which two design approaches must the engineer take to meet the requirement? (Choose two.)

Options:
A.

The controllers must have the same number of licenses.

B.

Each WLC must have a unique redundancy management IP address.

C.

Both WLCs must have the same redundancy management IP address.

D.

The controllers must run the same operating system version.

E.

Both WLCs must have the same service port IP address.

Questions 14

A network engineer must design a new wireless solution for a company, but the budget can only stretch to include a single Cisco 9800-40 WLC. The company requires high availability between the WLC and the core switch in the event of a cable failure. The WLC must dynamically manage port redundancy and perform load balancing between APs transparently. Which design approach must the engineer take to meet the requirements?

Options:
A.

LAG

B.

Multi-LAG

C.

LACP

D.

PAgP

Questions 15

Which CLI command does an engineer use to validate that the redundancy peer of a Stateful Switchover pair of controllers is up and connected?

Options:
A.

rping

B.

ping

C.

eping

D.

mping

Questions 16

An educational organization recently deployed an anchored WLAN and has a high number of client connections at any given time that stream video. The wireless infrastructure includes two Cisco 9800 WLCs. To prevent web traffic being slow, an engineer must configure the deployment to prevent excessive fragmentation of the client data. Which configuration must the engineer apply?

Options:
A.

Set the MTU on both controllers to match.

B.

Increase the MTU on both controllers.

C.

Adjust the TCP MSS value below the fragmentation point.

D.

Set the do not fragment bit on the mobility tunnel.

Questions 17

An engineer is performing an AP-on-a-stick survey and finds that the 5 GHz channel overlap is too high when an appropriate number of APs are used for the density requirements. Which two actions during the survey reduce channel overlap? (Choose two.)

Options:
A.

Raise the minimum data rate to 24 Mbps.

B.

Increase AP transmit power to improve the SNR.

C.

Allow the use of UNII-2e channels.

D.

Use directional antennas to limit the coverage area of some APs.

E.

Enable power saving mode.

Questions 18

Which strategies must the engineer use for the antenna deployment model in a warehouse?

Options:
A.

ceiling-mounted, directional antennas

B.

wall-mounted, low-gain, omnidirectional antennas

C.

ceiling-mounted, high-gain, omnidirectional antennas

D.

wall-mounted, patch directional antennas

Questions 19

A network engineer is configuring high availability on an access point. What is the maximum number of controllers that can be configured?

Options:
A.

1

B.

2

C.

3

D.

4

Questions 20

An enterprise is using two wireless controllers to support the wireless network. The data centre is located in the head office. Each controller has a corporate WLAN configured with different SSID names. The APs are installed using a round-robin approach to load balance the traffic. What should be changed in the configuration to optimize roaming?

Options:
A.

Move all access points to one controller and use the other as N+1 HA.

B.

Use the same WLAN name for the corporate network on both controllers.

C.

Use the same WLAN name for the corporate network on both controllers.

D.

Place the access points per floor on the same controller.