An enterprise is using wireless as the main network connectivity for clients. To ensure wireless network availability, two standalone controllers are installed in the head office. APs are connected to the controllers using a round-robin approach to load balance the traffic. After a power cut, the wireless clients disconnect while roaming. An engineer tried eping from the controller but fails. Which protocol needs to be allowed between the networks that the controllers are installed?
An engineer must design AP placements for a new branch office that contains two floors. The engineer uses Ekahau to complete the predictive survey. To calculate the signal bleed through between floors, the engineer creates a building, adds the floors, and attenuation areas. After the scale is set, what else must be added on the floors to accurately measure the signal bleed at a specific location?
An engineer must perform a predictive design for a wireless network. The customer has devices that can tolerate at most 100 ms of delay when roaming. Which design criteria must be used?
A wireless engineer must design a WLAN for a university that requires outdoor Wi-Fi access. Which obstruction has the greatest effect on wireless signal propagation?
Multiple WLCs are implemented in a high-availability configuration in a mobility group. APs are deployed with only a primary controller assigned. By default, which mobility group member controller do the orphaned APs join in the event of a failed controller?
A customer has a single anchor WLC named Anchor A. Anchor A is in a DMZ and provides guest access. The customer wants to deploy an additional anchor controller named Anchor B to provide redundancy if Anchor A fails. Which design approach should be taken for the guest WLAN priority on the foreign WLC for each anchor WLC?
A university has three campus locations and the main data center. Each campus location has a Cisco Catalyst 9800-40 WLC that manages 600 APs. The data center has a Catalyst 9800-40 WLC, which serves as N+1 backup for each campus WLC. A consulting engineer must install four additional Catalyst 9800-40 WLCs to serve as high availability SSO pairs for each campus, but only two have been approved due to budget restrictions. Requirements: Data center WLC must always be available as N+1 backup, Campus1 WLC must operate with zero downtime, and in the event of multiple campus outages, the AP priority order is to support Campus3, Campus2, then Campus1. Which design approach must the consulting engineer take?
A customer is planning to replace older access points with Cisco 4800 Series Access Points. Unaware of the infrastructure requirements, the client has an engineer investigate the inline power requirement. Which IEEE 802.3 standard complies with the Cisco 4800 Series Access Points?
A customer has an existing wireless network with a Cisco 9800 WLC high availability cluster and Cisco 9120 APs. The customer asks an engineer to perform a post wireless survey that includes a list of any non-802.11 devices on the 5 GHz band. The engineer performs the survey using an 802.11a/b/g/n/ac/ax WLAN adapter but did not use a spectrum analyzer. Which approach meets the requirements?
An engineer is implementing a wireless design for a manufacturing company with a Catalyst 9800, a stack of two Catalyst 9300-48HX switches, and 9166 APs. Each AP must be named using the Zone-053424189-01X string where X is the area number. The engineer needs to connect the APs to the switch stack using PoE. How many APs must the engineer connect to the stack so that they run with full functionality?
|
PDF + Testing Engine
|
|---|
|
$52.5 |
|
Testing Engine
|
|---|
|
$40.5 |
|
PDF (Q&A)
|
|---|
|
$34.5 |
Cisco Free Exams |
|---|
|