Which of the following is NOT an example of a perimeter pathway?
Assuming the total fill capacity of a pathway is 100 cables (all of the same cable type and size), the MAXIMUM number of cables to be installed during the initial installation, without exceeding the fill ratio is:
In a run requiring 15 m (50 ft) of cable between the floor distributor and the consolidation point, the MAXIMUM length of cable allowed between the CP and the telecommunications outlet is:
Which of the following is NOT a type of connector for optical fiber?
When installing outlet boxes in ten private offices in an area which may prove to be difficult to install future additional telecommunications outlets, the MINIMUM quantity of outlet boxes that should be installed is:
Select the appropriate task to complete section 2.2 of the work breakdown structure (WBS) below:
2 Technician
2.1 Install cabling
2.2 __________
2.3 Activate wireless
Exhibit:
If a work breakdown structure (WBS) shows the tasks below, what is C, the successor task?
A) Install OSP pathways
B) Install fiber
C) ________.
Which is NOT true about conformance quality?
Which is NOT a type of contract?
A scope of work should contain all of the following EXCEPT: