A large telecommunications facility, by most codes, must be designed with an EPO switch located at:

Options:
A.

The facility entrance or exit

B.

The main power panel

C.

Between the main power panel and the transformer

D.

Near each bank of equipment in the telecommunications space

BICSI RCDD-002 Premium Access
Questions 72

You have been asked to provide a N+1 level of power redundancy in the new equipment room (ER) being designed with a Tier-II power supply. What should you do?

Options:
A.

Provide a UPS that serves all of the equipment in the facility.

B.

Provide two separate UPS units with an automatic power failure transfer to serve entire facility.

C.

Provide two separate UPS units with each one serving half the equipment in the facility.

D.

Provide two separate UPS systems with one serving the entire facility and the second on automatic power failure transfer to serve critical circuits only.

Questions 73

An isolated ground is used to:

Options:
A.

Reduce transients

B.

Prevent interruptions

C.

Reduce EMI/RFI

D.

Reduce swells and sags

Questions 74

The average power consumption in a telecommunications room (TR) is 2260 watts per hour. What is the heat dissipation in BTUs?

Options:
A.

7096 BTU

B.

7713 BTU

C.

8104 BTU

D.

8511 BTU

Questions 75

DC loads are generally expressed in:

Options:
A.

Amperes

B.

Volts

C.

Voltage amperes (VA)

D.

Watts

Questions 76

To accommodate telephone, data, CATV, security and multimedia, a MINIMUM of ________ strands of optical fiber auxiliary disconnect outlet (ADO) cable should be provided.

Options:
A.

Two

B.

Four

C.

Five

D.

Six

E.

Eight

Questions 77

You are designing distribution for a seven unit townhouse with in slab conduits. What is the MINIMUM number of 27 mm (1 in) rigid PVC Type 2 or metallic conduit that is required to satisfy distribution to each unit?

Options:
A.

Three

B.

Four

C.

Five

D.

Seven

E.

Fourteen

Questions 78

You have just finished a design calling for 15 telecommunications outlets. You received word that the owner has increased his requirements by 40%. What size commercial DD (distribution device) is required to accommodate the increase?

Options:
A.

660 mm (26 in)

B.

1015 mm (40 in)

C.

1346 mm (53 in)

D.

1676 mm (66 in)

Questions 79

Which service is NOT typical of Grade 1?

Options:
A.

Telephone

B.

Multimedia

C.

Data

D.

Television

Questions 80

You are designing a multi-story dwelling and need to place the CTR's. Every floor is not available. What is the alternate spacing for the CTRs?

Options:
A.

Every 2 floors

B.

Every 3 floors

C.

Every 4 floors

D.

Every 5 floors

E.

1st floor and midway up through the height of the building