Summer Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

Free Adobe AD0-E906 Practice Exam with Questions & Answers | Set: 2

Questions 11

Given the following workflow launcher configuration:

AD0-E906 Question 11

What change should be made to the configuration to trigger the workflow?

Options:
A.

Modify the condition to dc==image/

B.

Modify the path to /content/dam/./)en(/./)

C.

Modify the node type to nt:file

Adobe AD0-E906 Premium Access
Questions 12

A user wants to send a new version of a document they have uploaded to Workfront (o make sure that this latest version is now available in Adobe Experience Manager Assets. This document has previously been uploaded into both Workfront and the AEM.

How should the user accomplish this?

Options:
A.

Select the document in Workfront rename to include the version number. click Send to. choose the experience Manager integration

B.

Select the document in Workfront. select New Version, choose the Experience Manager integration, upload the revised version

C.

Select the document in workfront. make sure it has the same name as the previous version, click Send to. Choose. The experience Manager integration

Questions 13

A project manager wants to ensure that all documents within a certain project are shared with a designated team in Workfront What is the correct option for carrying out this action?

Options:
A.

Link all the necessary document from Experience Manager to the designated project

B.

Find the project where these document all reside and share it with the entire team

C.

Share one of the documents the others will inherit the same access levels

Questions 14

An implementation consultant is configuring theenhanced connector Project Linked holders feature for a customer. The customer wants the linked folder structure to be defined using the workfront Portfolio name. WorkfrontProgram name. Workfront Project name, and the projecttype. The project type is a project custom form field defined by the following:

AD0-E906 Question 14

What Linked Folder Structure defines this correctly?

Options:
A.

Portfolio,Program,Name.DE:projectType

B.

Portfolio,Program,Name,projectType

C.

Portfolio,Program,project,Program, project Type

Questions 15

A creative agency submits proofs for review to stakeholders from multiple companies on a regular basis prior to releasing final assets the creative agency only requires one decision from a company prior to releasing a final asset.

Before the proofs are sent to the stakeholders, the creative director must review the proof. Since this is a standard workflow used for the majority of the work, a proofing workflow template can be set up to expedite the proof approval.

In which two ways may this proofing workflow template be set up? (Choose two)

Options:
A.

Stage 1 activate on proof creation, routing to the creative director, select do not allow this stage to be deleted.

B.

Stage 1 activate on proof creation, routing to the creative director, set as a private stage, select do not allow this stage to be deleted

C.

Stage 2 activate when all decisions are approved on parent stage and select only one decision required.

D.

Stage 2 activate when all decisions are made on parent stage and select only one decision required.

Questions 16

A company has a workflow where multiple people ate downloading and working on the same document simultaneously, which causes duplicationof efforts. The company wants to use a document feature that will stop others from downloading the documentwhen others are working on It.

Which documentfeature should De used?

Options:
A.

Go into the document details page and dick Checkout

B.

Change the document status to Unavailable

C.

Post an update stating mat an employee is editing the document