How can you limit the validity of a bill of material (BOM)?
How can SAP S/4HANA support a GMP-compliant production process?
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?
When can the automatic material availability check occur in a production order?
What does a line hierarchy in repetitive manufacturing represent?
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
Which mhetods are available for goods issue posting of material components for process orders?
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?
What is the purpose of a reporting point confirmation in repetitive manufacturing?
Which item statuses can you select inside a material BOM?