Your client is planning their next Minimum Lovable Product (MLP) release.
Which three pillars of case design must the Pega Business Architect ensure are taken into account, to capture information for the release? (Choose Three)
Select the bolded portion of each property reference by selecting the corresponding type from the list on the right.
.....notice that the scope of your project exceeds the original estimates, and the Minimum Lovable Product (MLP) might not be delivered on time.
A sales manager must be able to approve sales quote proposals by email and from their mobile devices. What do you implement this requirement?
…..assignment routes loan requests to a specific loan officer based on the type of loan.
If the loan is a mortgage, the case is routed to Adam Ross.
If the loan is for an automobile, the case is routed to Julia Samuels.
If the loan is an equity line, the case is routed to Don Smith.
….do you configure the routing to ensure the case advances to the correct loan officer?
PDF + Testing Engine
|
---|
$57.75 |
Testing Engine
|
---|
$43.75 |
PDF (Q&A)
|
---|
$36.75 |
Pegasystems Free Exams |
---|
![]() |