Scenario 5: Mechanical-Electro (ME) Audit Stages

Mechanical-Electro, better known as ME, is an American company that provides mechanical and electrical services in China. Their services range from air-conditioning systems, ventilation systems, plumbing, to installation of electrical equipment in automobile plants, electronic manufacturing facilities, and food processing plants.

Due to the fierce competition from local Chinese companies and failing to meet customer requirements, ME's revenue dropped significantly. In addition, customers' trust and confidence in the company decreased, and the reputation of the company was damaged.

In light of these developments, the top management of ME decided to implement a quality management system (QMS) based on ISO 9001. After having an effective QMS in place for over a year, they applied for a certification audit.

A team of four auditors was appointed for the audit, including Li Na as the audit team leader. Initially, the audit team conducted a general review of ME's documents, including the quality policy, operational procedures, inventory lists, QMS scope, process documentation, training records, and previous audit reports.

Li Na stated that this would allow the team to maintain a systematic and structured approach to gathering documents for all audit stages. While reviewing the documented information, the team observed some minor issues but did not identify any major nonconformities. Therefore, Li Na claimed that it was not necessary to prepare a report or conduct a meeting with ME's representatives at that stage of the audit. She stated that all areas of concern would be discussed in the next phase of the audit.

Following the on-site activities and the opening meeting with ME's top management, the audit team structured an audit test plan to verify whether ME’s QMS conformed to Clause 8.2.1 (Customer Communication) of ISO 9001.

To do so, they gathered information through group interviews and sampling. Li Na conducted interviews with departmental managers in the first group and then with top management. In addition, she chose a sampling method that sufficiently represented customer complaints from both areas of ME's operations.

The team members were responsible for the sampling procedure. They selected a sample size of 4 out of 45 customer complaints received weekly for electrical services and 2 out of 10 complaints for mechanical services.

Afterward, the audit team evaluated the evidence against the audit criteria and generated the audit findings.

According to scenario 5, Li Na conducted group interviews with departmental managers and top management by herself. Is this in accordance with audit best practices?

Options:
A.

Yes, only the audit team leader should conduct group interviews.

B.

Yes, the auditee’s top management is always interviewed by the audit team leader only.

C.

No, two auditors should be present in case of group interviews.

PECB ISO-9001-Lead-Auditor Premium Access
Questions 12

You are carrying out an audit at a single-site organisation seeking certification to ISO 9001 for the first time. The organisation offers warehousing and export services to customers. Customers are invoiced for the time stock items are stored in the warehouse. Transport to and from the warehouse is controlled by the organisation and approved subcontract transport services are used. The organization does not have its own transport vehicles. Stock items are not purchased by the organisation.

You have gathered audit evidence as outlined in the table. Match the ISO 9001 Clause 8 extract to the audit evidence.

ISO-9001-Lead-Auditor Question 12

Options:
Questions 13

Noitol is an organisation specialising in the design and production of e-learning training materials for the insurance market. During an ISO 9001 audit

of the development department, the auditor asks the Head of Development about the process used for validation of the final course design. She states that they usually ask customers to validate the product with volunteers. She says that the feedback received often leads to key improvements.

The auditor samples the design records for a recently completed course for the 247 Insurance organisation. Design verification was carried out but there was no validation report. The Head of Development advises that this customer required the product on an urgent basis, so the validation stage

was omitted. When asked, the Head estimates that this occurs about 50% of the time. She confirms that they always ask for feedback and often make changes. There is no record of feedback in the design file for the course.

The auditor raises a nonconformity against ISO 9001. Which one of the following options is the basis for the nonconformity?

Options:
A.

8.3.5 - The improvements made to course designs are not documented. Feedback from customers is not always actioned.

B.

8.3.2.c - Design planning does not include design validation. Design verification is part of the planning process.

C.

8.3.4.d - Design validation is not always conducted. It is omitted about half of the time.

D.

8.6 - Course materials are released without proper approval. A course for 247 Insurance was released on an urgent basis.

Questions 14

ISO 9001 requires that the organisation shall continually improve the quality management system.

Select the two options for how this can best be achieved.

Options:
A.

Appoint external consultants to train quality control staff

B.

Communicate a policy commitment to continual improvement

C.

Require higher standards for the work being done

D.

Require that all employees make fewer mistakes

E.

Send the Chief Executive on an ISO 9001 course

F.

Use the management review process to identify improvements

Questions 15

What are the criteria for reviewing documented information?

Options:
A.

Content, format, and the procedure for managing documented information

B.

Language of documented information, internal audit reports, client feedback

C.

Archive, volume, and confidentiality of documented information

Questions 16

You work for an organisation, 'A', which provides packaged food to the public. You are asked to lead a team (you as the leader and two other

auditors) to audit a supplier, 'B', which provides packaging materials to your organisation. It is 4 p.m. and the audit is close to an end; you are having

an internal meeting with the team to decide what will be presented to the auditee during the Closing meeting. The Closing meeting was scheduled

for 5 p.m.

You, as audit team leader, audited top management, the laboratory, and the storage of raw materials.

Auditor 1 audited the two manufacturing lines and dispatch areas.

You to Auditor 1: "What findings would you report?"

Auditor 1: "When reviewing the Dispatch records, I noticed that during the morning two different trucks (Number 011 and 025) delivered the same

batch number of the product (Batch 33555). Truck 011 left the plant at 9.15 am and Truck 025 left the plant at 11.30 am. Procedure P-02 Rev.3 says

that trucks should carry a complete batch. The batch number, once on the truck, is captured using a QR device."

You: "OK, what do you think?"

Auditor 2: "I think that this is a nonconformity."

You: "OK. How would you describe the evidence on which the nonconformity will be based"?

Identify which one of the following statements best describes the identified nonconformity.

Options:
A.

Dispatch personnel are not fully aware of the need to conform to written procedures.

B.

Dispatch personnel do not always carry out its activities in conformance with Procedure P-02 rev 3.

C.

The batch 33555 was delivered split in two different trucks (011 and 025).

D.

A product delivered to the client was not identified as required in P-02 Rev 3.

Questions 17

Whistlekleen is a national dry cleaning and laundry company with 50 shops. You are conducting a surveillance audit of the Head Office and are sampling customer

complaints. You find that 80% of complaints originate from five shops in the same region. Most of these complaints relate to damage to customer laundry. The Quality

Manager tells you that these are the oldest shops in the company. The cleaning equipment needs replacing but the company cannot afford it at the moment. You learn

that the shop managers were told to dismiss most of the claims on the basis of the poor quality of the laundered materials.

On raising the matter with senior management, you are told that there are plans to replace the equipment in these shops over the next five years.

ISO-9001-Lead-Auditor Question 17

Options:
Questions 18

What should the auditor document during the Stage 1 audit?

Options:
A.

The main processes of the auditee

B.

The interviews with the auditee’s employees

C.

The observations that could result in nonconformities during the on-site audit

Questions 19

Which two of the following are included in the objectives of the 'Stage 1 initial certification audit'?

Options:
A.

To evaluate the performance of monitoring and reviewing activities.

B.

To evaluate the preparedness of the organisation for a Stage 2 audit.

C.

To evaluate the internal audit and management review processes.

D.

To review the quality manual.

E.

To make a decision on certification to ISO 9001:2015.

F.

To evaluate the operational processes of the organisation.

Questions 20

Scenario 5: Mechanical-Electro (ME) Audit Stages

Mechanical-Electro, better known as ME, is an American company that provides mechanical and electrical services in China. Their services range from air-conditioning systems, ventilation systems, plumbing, to installation of electrical equipment in automobile plants, electronic manufacturing facilities, and food processing plants.

Due to the fierce competition from local Chinese companies and failing to meet customer requirements, ME's revenue dropped significantly. In addition, customers' trust and confidence in the company decreased, and the reputation of the company was damaged.

In light of these developments, the top management of ME decided to implement a quality management system (QMS) based on ISO 9001. After having an effective QMS in place for over a year, they applied for a certification audit.

A team of four auditors was appointed for the audit, including Li Na as the audit team leader. Initially, the audit team conducted a general review of ME's documents, including the quality policy, operational procedures, inventory lists, QMS scope, process documentation, training records, and previous audit reports.

Li Na stated that this would allow the team to maintain a systematic and structured approach to gathering documents for all audit stages. While reviewing the documented information, the team observed some minor issues but did not identify any major nonconformities. Therefore, Li Na claimed that it was not necessary to prepare a report or conduct a meeting with ME's representatives at that stage of the audit. She stated that all areas of concern would be discussed in the next phase of the audit.

Following the on-site activities and the opening meeting with ME's top management, the audit team structured an audit test plan to verify whether ME’s QMS conformed to Clause 8.2.1 (Customer Communication) of ISO 9001.

To do so, they gathered information through group interviews and sampling. Li Na conducted interviews with departmental managers in the first group and then with top management. In addition, she chose a sampling method that sufficiently represented customer complaints from both areas of ME's operations.

The team members were responsible for the sampling procedure. They selected a sample size of 4 out of 45 customer complaints received weekly for electrical services and 2 out of 10 complaints for mechanical services.

Afterward, the audit team evaluated the evidence against the audit criteria and generated the audit findings.

Which stages of the audit were performed?

Options:
A.

Audit follow-up and stage 1 audit.

B.

Stage 1 and stage 2 audit.

C.

Stage 2 audit and surveillance audit.