An engineer configures a new template stack for a firewall that needs to be deployed. The template stack should consist of four templates arranged according to the diagram
Which template values will be configured on the firewall If each template has an SSL/TLS Service profile configured named Management?
An engineer must configure a new SSL decryption deployment.
Which profile or certificate is required before any traffic that matches an SSL decryption rule is decrypted?
An administrator is defining protection settings on the Palo Alto Networks NGFW to guard against resource exhaustion. When platform utilization is considered, which steps must the administrator take to configure and apply packet buffer protection?
For company compliance purposes, three new contractors will be working with different device-groups in their hierarchy to deploy policies and objects.
Which type of role-based access is most appropriate for this project?
An administrator is assisting a security engineering team with a decryption rollout for inbound and forward proxy traffic. Incorrect firewall sizing is preventing the team from decrypting all of the traffic they want to decrypt. Which three items should be prioritized for decryption? (Choose three.)
A consultant advises a client on designing an explicit Web Proxy deployment on PAN-OS 11 0 The client currently uses RADIUS authentication in their environment
Which two pieces of information should the consultant provide regarding Web Proxy authentication? (Choose two.)
A firewall engineer creates a source NAT rule to allow the company's internal private network 10.0.0.0/23 to access the internet. However, for security reasons, one server in that subnet (10.0.0.10/32) should not be allowed to access the internet, and therefore should not be translated with the NAT rule.
Which set of steps should the engineer take to accomplish this objective?
Which two methods can be configured to validate the revocation status of a certificate? (Choose two.)
An internal audit team has requested additional information to be included inside traffic logs forwarded from Palo Alto Networks firewalls to an internal syslog server.
Where can the firewall engineer define the data to be added into each forwarded log?
A firewall engineer creates a NAT rule to translate IP address 1.1.1.10 to 192.168.1.10. The engineer also plans to enable DNS rewrite so that the firewall rewrites the IPv4 address in a DNS response based on the original destination IP address and translated destination IP address configured for the rule. The engineer wants the firewall to rewrite a DNS response of 1.1.1.10 to 192.168.1.10.
What should the engineer do to complete the configuration?
PDF + Testing Engine
|
---|
$66 |
Testing Engine
|
---|
$50 |
PDF (Q&A)
|
---|
$42 |
Paloalto Networks Free Exams |
---|
![]() |