After a failover and stabilization of workloads at the recovery AZ, an administrator removes several VMs from the protection policy because they are no longer required. Which action should be performed as part of post-failover cleanup to prevent unnecessary storage consumption?
An administrator is planning to deploy some 2-node clusters and is reviewing data protection strategies for some of the critical VMs.
What can be the minimum RPO for these VMs?
An administrator previously configured Synchronous Replication on a VM named MarketVM. Due to upcoming maintenance at the primary site, it was decided to use Cross Cluster Live Migration (CCLM) to move the VM to the secondary site. When running CCLM, the task failed. What is a possible reason for this CCLM failure?
A mission-critical VM utilizing an NVIDIA vGPU profile for high-end graphical processing is replicated from a primary Nutanix cluster to a secondary disaster recovery site. After failover of a VM using an NVIDIA vGPU profile, the VM boots but hardware acceleration does not function. What action is required?
An administrator executes an Unplanned Failover. The VMs recover at the Recovery Site and are powered on. However, the application owners report that the VMs are completely isolated and cannot communicate with any other services on the network. The administrator checks the Recovery Plan and notices the Network Mapping section was left blank.
What is the expected configuration for VMs recovered without a valid Network Mapping?
An administrator recently expanded a Nutanix cluster by adding several new nodes. Shortly after, multiple backup jobs began failing. The following error is consistently reported: " Failed to perform backup: Cannot complete process ' iscsiadm --mode discovery --type sendtargets --portal X.X.X.X ' within timeout " . What is the most likely cause of the failure?
An administrator is creating a recovery plan between two availability zones. The production VMs use a subnet that does not exist at the recovery AZ. To ensure the VMs can successfully connect after a failover, what must be configured?
An administrator intends to configure a NearSync replication schedule with a 15-minute Recovery Point Objective (RPO) on a hybrid 3-node cluster. The current nodes in the cluster are configured with one SSD and four HDDs each. Which cost-effective modification is required to support this specific replication schedule?
What must an administrator verify before starting a migration of entities from a protection domain to a protection policy?
An organization is finalizing its Disaster Recovery (DR) plan. The primary objective is to balance cost-efficiency with a target RTO of under 15 minutes. Data currently resides in Object Storage, but the team is debating between a Zero Compute approach and a Pilot Light approach. Why would a Pilot Light infrastructure be selected over a Zero Compute model despite the higher " Moderate " cost?
|