Choose the MOST suitable description of the structure of a performance test script
SELECT ONE OPTION
Inwhich activity of the testing process are specific test conditions identified for performance testing?
SELECT ONE OPTION
Base Scenario 1: This Base Scenario 1 is used for 2 questions throughout this exam. When you refer to Base Scenario 1, you are referring to this description and only this description, without any modification.
k given project for the development of a management software that will have a multilayer architecture will enable Its users to Install it in multiple locations, nationally and internationally - each installation can operate Independently and communicate with other instances in a selective way. Each installation shall have a high processing capacity.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
• The project follows a sequential development life cycle model.
Question
Which is the right moment in the project to analyze and evaluate the performance risks?
SELECT ONE OPTION
Select the option that identifies the possible causes of the degradation of a system's response over time during dynamic performance testing.
1.Disk fragmentation.
2.Network latency.
3.File repository growth.
4.Memory leaks.
5.Inadequate database design.
SELECT ONE OPTION
(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
• Natalie should make a presentation to the technical stakeholders In order to explain the performance test plan.
Question
Which ONE of the following options contains information that should be included in Natalie's presentation to the technical stakeholders?
SELECT ONE OPTION
Choose the ONE option that describes the example of a transaction. The scenario for this question is the transfer of an amount of money from one bank account to another.
SELECT ONE OPTION
Refer to Base Scenario 1: When you refer to Base Scenario 1, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
•The project follows an iterative and Incremental development life cycle model.
•Development approach: Agile.
Question
Which of the statement(s) below is (are) TRUE regarding how the performance test is undertaken7
1.The performance test can have a dedicated iteration in a specific way.
2.Performance testing should be performed in a cloud-based performance test environment
3.The performance test may be conducted by a specific team.
4.A performance test cycle must be performed in each iteration by the development team (Agile).
SELECT ONE OPTION
Associate each type of performance test (listed from 1 to 5) with part of a description that allows its characterization and/or identification (listed from A to E).
1.Endurance testing
2.Scalability testing
3.Capacity testing
4.Stress testing
5.Concurrency testing
1.Type of testing focused on the ability of a system to meet future efficiency requirements.
2.Type of testing used to evaluate a system's ability to handle reduced availability of resources.
3.Type of testing focused on the stability of the system over a specific time frame.
4.Type of testing used to determine the number of transactions a given system will support while still meeting established performance objectives.
5.Type of testing focused on the impact of situations where specific actions occur simultaneously.
SELECT ONE OPTION
If a performance test is testing the response time of an application to be connected through remote access, which protocol is being used?
SELECT ONE OPTION
Identify the correspondences between performance measures and metrics (1 -6) and the different environments (A C) in which performance evaluation is needed.
1.Alerts and warnings.
2.Concurrency of usage.
3.Operational processes.
4.Resource utilization.
5.Response time.
6.Throughput of data, transactions, and other units of work performed.
1.Operating environment.
2.Business environment.
3.Technical environment.
SELECT ONE OPTION