A customer has deployed CX 10000 switches, Fabric Composer, and Pensando Policy and Services Manager (PSM). The switches are discovered in PSM, but no VRFs or networks have been added. The customer now wants to begin by applying micro-segmentation to one network. They state that they plan to add a policy containing rules that permit desired traffic from endpoints in this network. They will apply it to the network as an egress policy. At this time, they will not add any other networks to PSM or apply policies to them.
What warning should you raise to the customer about this plan?
A long-time customer has just acquired a company and plans to bring the new data-center sites up to its standards. The customer has requested a bill of materials based only on the locations and port counts at the data-center sites.
Which valid assumptions should be documented in the proposal? Choose two.
A customer’s data center uses structured cabling based on MMF OM5. The customer plans to upgrade the spine switches in their spine-and-leaf topology. A primary objective of this upgrade is eventually to support 400GbE leaf-to-spine links. However, many leaf switches will continue to support 100GbE uplinks for some time.
What is a valid recommendation for the spine switches?
Waratah Hospital, located in Australia, plans to move many data-center services to a new facility. (The remaining legacy data center is not included in this project.) Waratah Hospital has hired an external consultant to help design the new data-center network.
Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The following summarizes the design document.
Requirements and information:
Six racks in the data-center room (a single row).
Redundant top-of-rack leaf switches with back-to-front cooling in every rack, providing 10/25 Gbps connectivity to servers, storage, and other devices.
Four 100 GbE uplinks per leaf switch.
The customer requested that all switch ports face the back of the rack racks (hot aisle).
OOB management for servers, storage, and network must be provided through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
Core equipment for the OOBM network is being reused.
Middle-of-row spine switches.
The data center must connect to the hospital building using links that provide 400 Gbps.
Internet access is supplied through an existing firewall cluster with two firewalls, with one firewall in each data room. The second firewall operates in standby mode, and VRRP is used on the firewalls for failover. The data-center network must connect to these firewalls using links totaling 100 Gbps.
The external link is a dark-fiber direct link based on single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
99.999% uptime for this life-critical environment.
Planned and unplanned downtime must be minimized.
Software upgrades are permitted only once per year with close to zero downtime.
All life-critical resources are accessed locally, and all resources reside within the hospital campus.
Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.
Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.
In the past, the hospital experienced a security breach that resulted in data loss, network downtime, and identity theft.
Given the scenario, which environmental requirements are stated? Choose two.
A customer requires management access to switches over SSH. Which authentication mechanism can be implemented?
You have designed a spine-and-leaf topology containing 16 leaf switches and four spine switches. The customer does not have an existing overlay solution. You are helping the implementer work with the customer to obtain IP address blocks for the design. You plan to request these /24 subnets:
One for an individual loopback interface on each switch.
One for point-to-point connections between leaf and spine switches.
What is one correction you must make?
The customer runs a 24/7 production facility and is concerned that the migration could interrupt the production line.
Which two approaches can minimize or eliminate this disruption? Choose two.
Refer to the exhibit.

You can change the services to save the customer money without affecting the level of support delivered. What change should you make?
Which characteristics are important to mention when discussing potential VMware host connections to server-access switches?
In a multi-fabric design, what is the minimum recommended MTU?
|