An architect is preparing a proposal that a customer's board will use to approve or decline the work. What should shape how it is written?

Options:
A.

The full technical detail, so that nothing is omitted, and the record stays complete.

B.

The structure the customer's procurement team uses for supplier submissions.

C.

The order in which the elements of the solution will be built.

D.

The decision the board has to make, and what it needs in order to make it.

HP HPE0-V18 Premium Access
Questions 32

A customer states a requirement that cannot be met by any available arrangement within their stated budget. What is the architect's obligation?

Options:
A.

To say so plainly, and set out what could be achieved instead.

B.

To decline the opportunity, since the requirement cannot be satisfied.

C.

To propose the arrangement that meets the requirement and let the customer find the funds.

D.

To propose the closest available option without drawing attention to the shortfall.

Questions 33

After discovery, an architect concludes that the customer's existing arrangement already meets the requirement they raised, and that the difficulty lies in how it is being used. What is the appropriate recommendation?

Options:
A.

Recommend replacement, since the current arrangement will eventually need refreshing anyway.

B.

Recommend a modest addition anyway, since the engagement was opened on that basis.

C.

Report that finding, and address the way the arrangement is being used rather than replacing it.

D.

Report the finding but leave the usage problem with the customer to resolve.

Questions 34

A customer's deployed solution was built to run its order processing. The business now wants to analyse the large volumes of sensor data its warehouses produce, work the solution was never designed to carry, and asks whether it should simply add more of what it already has. What should the architect propose?

Options:
A.

More of the existing solution, since the team already knows how to operate it.

B.

An upgrade of the existing solution to its latest release, so it gains newer capabilities.

C.

A new capability designed for the sensor analysis, positioned alongside the order-processing solution.

D.

A delay until the sensor volumes are known well enough to size additional capacity precisely.

Questions 35

A customer with workloads spread across edge sites, its data centre and a public cloud says it cannot tell where its capacity is being consumed, and wants to reduce waste. What should be addressed first?

Options:
A.

Establishing a single view of what is consumed across all three locations.

B.

Renegotiating the commercial terms at each of the three locations.

C.

Consolidating the workloads into whichever location currently has the lowest unit cost.

D.

Reducing the capacity at each location by an agreed percentage.

Questions 36

Which of these is a technical requirement?

Options:
A.

The solution must reduce the cost of running the current estate.

B.

The programme must be delivered before the end of the financial year.

C.

The board must be able to report progress to shareholders each quarter.

D.

The service must remain available if one site loses power.