Weekend Special Sale 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sale75best

Free HP HPE0-V18 Practice Exam with Questions & Answers | Set: 2

Questions 11

A manufacturer tells an architect that it wants more storage capacity because its analytics reports have started arriving late. On investigation the storage is only half consumed, but the reporting job now reads far more historical data than it did a year ago and runs on the same schedule as the nightly backup. What should the architect conclude? (Choose two.)

Options:
A.

The stated request for capacity does not follow from the evidence found.

B.

The reporting job should be rewritten to read less historical data.

C.

Additional capacity should be ordered as a precaution while the cause is investigated.

D.

Contention with the nightly backup is a candidate explanation, worth testing before anything is bought.

E.

The customer's request should be met, since the customer understands its own environment best.

HP HPE0-V18 Premium Access
Questions 12

A customer running workloads at edge sites, in its data centre and in public cloud wants to manage them coherently. Which capabilities does that require? (Choose two.)

Options:
A.

A single physical network connecting all locations directly.

B.

Identical hardware at every location, so that management behaves the same way everywhere.

C.

Policies that can be defined once and applied consistently across the locations.

D.

A view of the whole estate that does not depend on which location a workload sits in.

E.

Local administrators present at each edge site during working hours.

Questions 13

While reviewing another team's design, an architect finds that one of the customer's stated requirements can be read in two ways, and that the design satisfies only one of them. What should the review record?

Options:
A.

That the requirement should be removed until the customer restates it unambiguously.

B.

That the requirement needs clarifying, and which reading the design assumes.

C.

That the design is non-compliant rather than ambiguous, since one valid reading of the requirement is unmet.

D.

That the design is compliant, since a defensible reading of the requirement is satisfied.

Questions 14

A customer is standing up a new analytics workload and has told the architect that its networking estate is being refreshed at the same time, that its analytics team already works with a specific software vendor, and that whatever is proposed has to be supportable by the customer's existing operations process. Which considerations belong in positioning the workload alongside the wider ecosystem? (Choose two.)

Options:
A.

Whether the analytics results must be retained under the customer’s existing data policy.

B.

How the proposed solution and the refreshed networking are supported together rather than separately.

C.

Whether the analytics workload could be deferred, and restarted, after the refresh.

D.

Whether the analytics workload could be hosted by the incumbent software vendor directly.

E.

Whether the analytics team's existing software choice is accommodated by what is proposed.

Questions 15

A customer states two requirements that pull against each other: everything must be recoverable within a very short window after a failure, and the total spend must stay inside a fixed cap that will not cover full duplication. How should the architect proceed?

Options:
A.

Ask the customer to raise the cap, since the two requirements cannot both be satisfied as stated.

B.

Establish with the customer which workloads genuinely need the short recovery window, and protect those.

C.

Design to the recovery requirement and present the resulting figure to the customer, since availability outranks cost.

D.

Design to the cost cap and note that the recovery window will not be met across the estate.

Questions 16

A retail group tells a presales architect that stock-checking devices in its stores are slow, and asks for a proposal to move the supporting workload closer to the stores. The architect has been given the current application's name, the number of stores, the response time the group wants to achieve, and a target date. Nothing else has been captured. Which gaps must be closed before an offering can responsibly be positioned? (Choose two.)

Options:
A.

What the stores must still be able to do when their link to the data centre degrades.

B.

Which consumption model the group would prefer for whatever is proposed.

C.

What the group would like the response time to become once the workload has moved.

D.

Whether the stock-checking devices themselves are due for replacement in the period.

E.

Which measurement led the group to describe the devices as slow.

Questions 17

A customer is nervous about a large change and has said so directly. How can a recommendation respond to that without abandoning the objective?

Options:
A.

Provide documentation, so the customer understands the change fully.

B.

Propose the change in stages, with something demonstrable and useful at the end of the first.

C.

Reduce the scope so the change is small enough to be comfortable.

D.

Include a commitment to reverse the change, and restore the prior state, if it fails.

Questions 18

A customer's month-end financial consolidation runs for two days and needs no resources for the rest of the month. It runs on an application from one of the alliance partners, and the architect intends to position capacity that is taken up for the consolidation and released afterwards. What must be confirmed about the partner's application before this is proposed?

Options:
A.

Whether a newer release of the application exists than the one the customer runs today.

B.

Whether its licensing and support terms allow it to run on capacity taken up and released each month.

C.

Whether the finance team could spread the consolidation across the month, so that no capacity needs releasing.

D.

Whether the consolidation results could be produced by a simpler tool the customer already owns.

Questions 19

A customer says it would prefer a single supplier for everything, but one part of its requirement is served noticeably better by a partner component. How should the architect present this?

Options:
A.

Ask the customer to rank supplier consolidation against capability before any option is prepared.

B.

Show what the preference would cost in capability, and let the customer decide.

C.

Follow the stated preference, since supplier consolidation is a legitimate customer priority.

D.

Propose the partner component, and set the stated preference aside, since capability should decide.

Questions 20

A public-sector organisation says its case-management data must remain on infrastructure it can point to and account for, that demand rises sharply for a few weeks around an annual deadline, and that it has recently lost two of its four infrastructure specialists and cannot recruit quickly. Which of these requirements are well served by positioning a private cloud solution? (Choose two.)

Options:
A.

Routine requests for environments must be met without drawing on the two remaining specialists.

B.

Demand rises and falls sharply for a few weeks around an annual deadline.

C.

Case-management data is the organisation's most sensitive information.

D.

Data must remain on infrastructure the organisation can point to and account for.

E.

Replacement staff cannot be brought in at short notice.