Free HP HPE0-V18 Practice Exam with Questions & Answers | Set: 3

Questions 21

A customer asks what HPE Services adds, given that it is already buying the underlying solution. What does the HPE Services proposition principally address?

Options:
A.

The training courses a customer's staff complete before installation, rather than the support that follows it.

B.

Replacement of failed hardware, and its return to service, within an agreed period.

C.

The expertise and support surrounding a solution across its life.

D.

The discount available when several parts, bought together, are ordered as one.

HP HPE0-V18 Premium Access
Questions 22

A draft design for a customer provides capacity roughly three times the peak the customer described, places every workload centrally, and includes no arrangement for the branch offices to keep operating if their links fail. The customer's brief asked for cost efficiency and for branches to remain usable during link outages. Which findings should the review record? (Choose two.)

Options:
A.

Capacity at three times the described peak is prudent, given that the customer may grow into it.

B.

Capacity substantially exceeds the described peak, which works against the stated cost efficiency.

C.

Branch operation during a link failure is unaddressed, although the brief required it.

D.

The branch link failures should be addressed by improving the links rather than by the design.

E.

The customer's description of its peak demand should be independently verified.

Questions 23

A customer's private cloud offers development teams a catalogue of approved environment configurations. The security function has now changed what an approved configuration must contain, and many environments built from the old definition are already running. What should the architect advise?

Options:
A.

Update the catalogue so new environments conform, and plan separate remediation for those already running.

B.

Update the catalogue, since running environments will pick up the change from the new definition.

C.

Leave the catalogue unchanged until every running environment has been brought into line.

D.

Withdraw the catalogue and route requests to the security function until the change settles.

Questions 24

A customer is moving from a long-standing arrangement to a new solution and expects to run both for a period. Where do services most add value during that overlap?

Options:
A.

In carrying the work of running two arrangements at once, which the team was never sized for.

B.

In negotiating the exit terms of the arrangement being replaced.

C.

In documenting the old arrangement before it is decommissioned.

D.

In shortening the overlap, so the old arrangement retires sooner.

Questions 25

A customer operates workloads at several edge sites, in its own data centre, and with a public cloud provider, and each is currently administered through its own tooling. What does managing these through a single Edge-to-Cloud management approach principally give the customer?

Options:
A.

Direct control over the provider's underlying infrastructure, rather than over how the estate is operated.

B.

A reduction in the volume of data each workload generates.

C.

One consistent way of operating, so that separately administered locations are run alike.

D.

A reduction in the number of separate locations the estate spans.

Questions 26

A customer's infrastructure team wants to standardise on components it already operates. Its analytics group wants a specific partner component it says materially improves its results. The customer's executive sponsor has asked for one recommendation, not a menu. How should the architect proceed? (Choose two.)

Options:
A.

Present both positions to the sponsor and ask them to choose between the teams.

B.

Establish what the analytics group's improvement is actually worth to the business.

C.

Recommend the analytics group's preference, since it is closest to the business outcome.

D.

Recommend the infrastructure team's preference, since operational simplicity has lasting value.

E.

Establish what standardising would genuinely save the infrastructure team.

Questions 27

A customer’s private cloud has reached the limit of its available capacity, and a development team’s request cannot be met. What does this tell the customer?

Options:
A.

The pool needs replenishing, since self-service cannot issue what does not exist.

B.

The requesting team exceeded its entitlement and should be asked to justify the request.

C.

Workloads should be moved to public capacity until the private environment is expanded.

D.

The self-service mechanism has failed and should be investigated as a defect.

Questions 28

An architect is demonstrating a completed solution against the customer's brief. What constitutes acceptable evidence that a requirement is met? (Choose two.)

Options:
A.

The supplier's published specifications state the capability the requirement calls for.

B.

The behaviour required can be observed in the built solution.

C.

A comparable solution elsewhere has been shown to meet the same requirement.

D.

The components specified in the design are present and correctly configured.

E.

The condition the requirement names can be induced and the solution responds as specified.

Questions 29

An architect is weighing two ecosystem components that both meet the customer's stated requirement equally well today, and both are already covered by the customer's existing support arrangement. What is the most useful additional consideration?

Options:
A.

Which choice has the larger installed base across the industry.

B.

Which choice the customer’s existing support arrangement already covers.

C.

Which choice leaves the customer with more room to change direction later.

D.

Which of the two was put on the market more recently than the other one.

Questions 30

At handover, every requirement in a customer's brief has been demonstrated except one: failover to a second site, which cannot be shown until that site is built next quarter. How should the architect handle the handover?

Options:
A.

Hand over what is demonstrated, and agree the failover test with the customer as an open acceptance item.

B.

Declare the solution complete, since the failover design was reviewed and approved during the design stage.

C.

Withhold the whole handover until the second site is built and failover has been shown.

D.

Show failover between two systems within the first site instead, and record the requirement as met.