An MCB needs to be installed in the PDU of an ICT rack. Which breaking curve should you select?
Where should perforated tiles be installed?
The location of a data center is just above the Arctic Circle (North Pole). The outside air temperature is never above 21°C/70°F.
Taking energy efficiency as the highest priority, which cooling system should you recommend?
When are the wet bulb and dry bulb temperatures identical?
Should aerosol cleaning solutions be used in the computer room?
What indicates the overcurrent of a fuse or breaker?
Management has requested a 15-minute battery bank assuming full load on the UPS. The UPS vendor has provided the following specifications of the UPS:
•Rated power: 30 kVA
•Rectifier input voltage: 400 V/3 phase
•Rectifier input power factor: 0.8
•Battery rated voltage: 384 V
•Number of cells: 192
•End of discharge voltage: 308 V
•Inverter output voltage: 400 V/3 phase
•Inverter output power factor: 0.8
What information is missing to perform the battery calculation?
It is assumed that EMF shielding material must be installed as the EMF levels coming from the transformer room into the computer room are measured at 100mG. The transformer room is approximately 10 meters away from the computer room and is separated by a corridor. You can assume that no physical issues are present for installing shielding material at any area/location.
Where should you recommend the shielding material to be installed?
Management requests a 15-minute battery bank at full UPS load. UPS specs:
30 kVA, PF 0.8
Battery 384 V (192 cells), end discharge 308 V
Inverter PF 0.8, 400 V output
What information is missing to perform the calculation?
A data center requires an audit to find out whether it conforms with ANSI/TIA-942 Rated-3 (concurrently maintainable).
Will the network architecture be part of this audit?
PDF + Testing Engine
|
---|
$57.75 |
Testing Engine
|
---|
$43.75 |
PDF (Q&A)
|
---|
$36.75 |
Exin Free Exams |
---|
![]() |