When should a post-occupancy evaluation by the facility manager be performed?
What is the term used to describe the time it takes to procure an item on site?
Which of the following is NOT a method of specifying?
How does the architect/engineer control the project cost when not enough information is available to make product decisions during the design phases of a project?
In construction documents, what does the agreement refer to?
Which party is usually required to maintain record drawings during the project according to the Project Delivery Practice Guide?
Which is the reference document that includes guidelines and tools for the organization and presentation of design and construction drawings?
Which of the following terms describes the process of allocating resources for the continued performance of a building’s intended function?
There are over 3,500 different grades of steel. The amount of carbon, level of impurities, and additional elements all contribute to what grade steel is classified as in building projects. Therefore, which of the following is the method of specification writing used to limit lengthy descriptions of materials?
The dual nature of design includes what two elements?
|
PDF + Testing Engine
|
|---|
|
$57.75 |
|
Testing Engine
|
|---|
|
$43.75 |
|
PDF (Q&A)
|
|---|
|
$36.75 |
Construction Specifications Institute Free Exams |
|---|
|