Free Autodesk BIM_MGT_101 Practice Exam with Questions & Answers | Set: 2

Questions 11

A client is seeking bids from a range of possible fabricators to determine which will win the contract to join the team.

What settings in Autodesk Forma allow a team to distribute files to a party that is not a project member?

Options:
A.

Audit and Compact the file and then save.

B.

Centralize the model and have the recipient create a local file.

C.

Set the permissions of the folder to allow Everyone to access.

D.

Enable the project for public sharing and send a transmittal from the files.

Autodesk BIM_MGT_101 Premium Access
Questions 12

Refer to the exhibits.

BIM_MGT_101 Question 12

BIM_MGT_101 Question 12

BIM_MGT_101 Question 12

BIM_MGT_101 Question 12

A BIM manager is preparing a site model that includes three separate buildings. Which exhibit shows the correct way to assemble and position the individual building models on the site while maintaining proper coordinates and orientation?

BIM_MGT_101 Question 12

BIM_MGT_101 Question 12

BIM_MGT_101 Question 12

BIM_MGT_101 Question 12

Options:
A.

Exhibit 4

B.

Exhibit 3

C.

Exhibit 2

D.

Exhibit 1

Questions 13

A BIM manager is reviewing a consultant’s architectural model before the next coordination milestone. The project requires each model to conform to a defined naming convention, include COBie parameters, and populate shared parameters according to the Model Element Table. The BIM manager notices that several elements are missing metadata and that some naming is inconsistent.

Which step best supports a systematic evaluation of completeness and compliance with project standards?

Options:
A.

Manually review each element in the Model Browser to confirm naming and parameter completeness.

B.

Use a model checker or data-validation tool to compare parameter presence, naming conventions, and required values against the established project standard.

C.

Ask the design team to re-export the model with updated information based on verbal clarification and metadata from the BIM Execution Plan.

D.

Filter out incomplete elements in a 3D view and hide them to avoid confusion during coordination.

Questions 14

During a model health check, a BIM manager notices that an international airport project’s models are 1 GB each. The team has not mentioned any issues, but they did miss a recent 50% Construction Documents deadline.

What should the BIM manager do?

Options:
A.

Create a separate model for sheets and ask the team to audit and compact the models every day.

B.

Proceed to check another project’s model health since the team has not mentioned any issues.

C.

Coordinate with the project team to purge the model, remove unused views, and address warnings.

D.

Assign multiple BIM managers to the project and take one week to clear every warning.

Questions 15

Refer to the exhibit.

BIM_MGT_101 Question 15

Upon opening a model, the following warnings saying “Room Tag is outside of its Room” appear.

What action should the BIM manager ask the design team to take in order to identify any Room Tags that need a leader because the tag may be too big to fit within the room?

Options:
A.

Select Show to address each tag.

B.

Select Export to move the warnings outside the model.

C.

Select Close to exit the Warnings window.

D.

Select Delete Checked to resolve each tag.

Questions 16

A BIM manager is preparing to onboard a group of subcontractors into Autodesk Forma for a large healthcare project. These subcontractors need access to a limited set of model files related only to interior partitions, but should not be able to view or modify structural, MEP, or scheduling content.

What two actions should the BIM manager take to manage data security in this scenario? (Select two.)

Options:
A.

Create and share a Package with specific set-up content.

B.

Provide access to the entire model set but watermark any non-applicable content.

C.

Assign full project access and ask team leads to verbally explain access limitations.

D.

Hide coordination issues from the subcontractors to limit liability.

E.

Assign role-based permissions and folder-level access aligned with the subcontractors’ scope.

Questions 17

A new project being set up requires consistency across all floor plans. However, because of variations in floor-to-floor heights, the project team needs a different View Range for each level.

What is the most efficient way to accommodate this?

Options:
A.

Deselect the Include box for View Range in the View Template.

B.

Keep one View Range for all plans and add Plan Regions as needed.

C.

Remove the View Template and control View Range through Visibility/Graphics.

D.

Duplicate the View Template for each view to control its View Range.

Exam Code: BIM_MGT_101
Certification Provider: Autodesk
Exam Name: Autodesk Certified Professional in BIM Management for Building Design
Last Update: Jul 12, 2026
Questions: 57
PDF + Testing Engine
$164.99
$49.5
Testing Engine
$124.99
$37.5
PDF (Q&A)
$104.99
$31.5