A Six Sigma team plans to perform a single replicate of a 2³ full factorial experimental design over the course of two days. If the team has no prior knowledge of interactions between factors, which of the following interaction terms can be confounded with blocks to provide the best design for the time allotted?

Options:
A.

AC

B.

BC

C.

D.

ABC

ASQ CSSBB Premium Access
Questions 72

A hospital is preparing for a survey for a certification process by an accreditation body. Administration has provided hospital managers with a list of items that the assessors will be asking about. Which of the following analysis tools should management use as part of their preparation for this assessment?

Options:
A.

Failure mode and effects analysis (FMEA)

B.

Root cause analysis (RCA)

C.

Gap analysis

D.

Measurement system analysis (MSA)

Questions 73

Which of the following tools should be used to convert a broad goal into increasingly detailed levels?

Options:
A.

Tree diagram

B.

Affinity diagram

C.

Matrix diagram

D.

Interrelationship digraph

Questions 74

Which of the following benefits can be realized directly from a complete, well-defined process map?

Options:
A.

Quantitative analysis of the process input and output variables

B.

Development of an attributes control chart

C.

Development of a variables control chart

D.

Insight into the process that is not otherwise apparent

Questions 75

Which of the following factors should be considered while prioritizing Six Sigma projects?

Options:
A.

Resources required and project length

B.

Master Black Belt preference and the impact on customers

C.

Project’s value to the business and resources required

D.

Project’s value to the business and Black Belt’s preference

Questions 76

Which of the following examples represents an effective problem statement for a project team?

Options:
A.

“The contracting division needs a planning tool.”

B.

“Headquarters is inadequately staffed.”

C.

“The recruiting process needs to be automated.”

D.

“Invoices take excessive time to process.”

Questions 77

During which of the following phases of DSIADV would a Black Belt start developing a process map?

Options:
A.

Define

B.

Measure

C.

Analyze

D.

Design

Questions 78

A Black Belt is testing the wear of two different brands of tires to be purchased for a truck fleet. Ten trucks have two tires of each type installed. The trucks are driven for 20,000 miles with tire rotation every 5,000 miles. Which of the following tests should the Black Belt use to assess the results of the wear test?

Options:
A.

A one-sample Z test

B.

A two-sample Z test

C.

A two-sample t test

D.

A paired t-test

Questions 79

Rank in order, from first to last, the sequence of steps a team should take to build a house of quality.

    Develop a relationship matrix

    Identify the technical requirements

    Capture the voice of the customer

    Determine the target values

Options:
A.

2, 3, 1, 4

B.

2, 3, 4, 1

C.

3, 2, 1, 4

D.

3, 4, 2, 1

Questions 80

Which of the following roles would be responsible for removing a roadblock in a process improvement project?

Options:
A.

Project Coordinator

B.

Project Leader

C.

Project Champion

D.

Project Facilitator