Free ASQ CSSBB Practice Exam with Questions & Answers | Set: 4

Questions 31

Which of the following tools can be used to break down the tasks for implementing a strategic objective?

Options:
A.

Affinity diagram

B.

Interrelationship digraph

C.

Tree diagram

D.

Pareto chart

ASQ CSSBB Premium Access
Questions 32

In a one-factor analysis of variance with five treatment groups, the sample sizes are [source text incomplete in the provided prompt]. How many degrees of freedom are there for the error term?

Options:
A.

4

B.

30

C.

34

D.

35

Questions 33

Typically, the role of a green belt is to

Options:
A.

perform advanced statistical analysis on specific projects

B.

communicate with management regarding the progress of a project

C.

coach new members of the project on the process of change

D.

participate in projects specific to their areas of expertise

Questions 34

A test for independence of the variables shown in the table below (alternative vs. result) produced a test statistic with a value of χ² = 17.0.

CSSBB Question 34

At a significance level of α = 0.05, which of the following conclusions can be made?

Options:
A.

χ²crit = 11.07; do not reject H₀, conclude the variables are independent

B.

χ²crit = 11.07; reject H₀, conclude the variables are dependent

C.

χ²crit = 9.49; do not reject H₀, conclude the variables are independent

D.

χ²crit = 9.49; reject H₀, conclude the variables are dependent

Questions 35

As DMAIC projects are rolled out to process owners and staff, training needs to focus on

Options:
A.

obtaining top management support

B.

giving instruction on how to plan, administer, and control the work to top management

C.

motivating the staff to higher productivity and quality

D.

providing process owners and staff instructions on planning, doing, and controlling the process

Questions 36

Which of the following statements best describes the relationship between a project charter and a project plan?

Options:
A.

A project plan is used to initiate the charter.

B.

A project plan is revised based on tollgates identified in the charter.

C.

A project charter is used to identify the scope of the plan.

D.

A project charter is used to detail each step of the plan.

Questions 37

In hypothesis testing, if α = 0.05 and β = 0.10, what is the power of the test?

Options:
A.

0.05

B.

0.90

C.

0.95

D.

10.00

Questions 38

Which of the following actions is an example of a kaizen project?

Options:
A.

Redefining product specifications

B.

Relocating a manufacturing facility overseas

C.

Partnering with suppliers to improve quality issues

D.

Designing a next-generation product

Questions 39

Rank in order, from first to last, the steps a quality improvement team should take when conducting a benchmarking study.

    Identify the areas to be improved

    Flowchart current process

    Investigate how others are doing

    Initiate new process

    Develop plans for application

Options:
A.

1,2,4,3,5

B.

1,3,2,4,5

C.

2,1,3,5,4

D.

2,5,3,1,4

Questions 40

In the Theory of Constraints, the performance of a series of interconnected processes is driven by the performance of the

Options:
A.

weakest performing discrete process

B.

strongest performing discrete process

C.

operations staff

D.

scrap or rework rates required by the process