Free USGBC LEED-AP-ND Practice Exam with Questions & Answers | Set: 3

Questions 21

In ardor to achieve the Neighborhood Pattern and Design Credit. Visit ability and Universal Design. the owner of a new six-unit residential building has decided to incorporate universal design strategies throughout each home. Which of the following features contributes to mat credit?

Options:
A.

Easy-to-reach door knobs

B.

Met on sensors on all faucets

C.

Motion dot tic tor lighting in Bedrooms

D.

Easy-touch rocker or hand-tree switches

USGBC LEED-AP-ND Premium Access
Questions 22

In a LEED for Neighborhood Development project, in order to earn one point for Innovation Credit. LEED Accredited Professional, the individual must have which accreditation?

Options:
A.

LEED AP Neighborhood Development

B.

LEED AP Building Design and Construction

C.

Any LEED AP without specialty credential

D.

LEED AP with any specialty credential

Questions 23

A project team has arranged to use recycled infrastructure components. Thirty percent (30%) by mass ot the new material infrastructure components contain post-consumer recycled content. Ten percent (10%) by mass of the infrastructure is on-site reuse materials.

What Is the minimum additional percentage of recycled content (by mass) that must come from pre-consumer materials?

Options:
A.

0%

B.

10%

C.

20%

D.

25%

Questions 24

A developer is considering purchasing a 400-acc (161 hectare) site which la currently zoned (or two dwelling units(DU) per sere (five DU/hectare).Which initial action during the entitlement process would help make the site eligible for LEED for NeighborhoodDevelopment certification?

Options:
A.

Create an overlay district

B.

Rezone the project for a higher density

C.

Build commercial uses around the development border

D.

Contact the Location and Planning Technical Advisory Group for initial review

Questions 25

A project includes previously developed lotswithin the LEED for Neighborhood Development boundary. For the purpose ofcalculating previously developed site area, which lot size may be consideredto be 100% previously developed?

Options:
A.

0.5 acre (0.2 hectare)

B.

1.5 acres (0.61 hectare)

C.

2 acres (0.81 hectare)

D.

2.5 acres (1.01 hectare)

Questions 26

The total area of all buildings on a project is 125,000 ft2 (11 612 m2). 63.750 ft2 (5.922 m2) of the project is within 1/2 mi (800 m) of 11 diverse uses and 106.240 ft2 (9.870 m2) of the project buildings are oriented for maximum solar orientation. What credit is the project eligible to achieve?

Options:
A.

Neighborhood Pattern and Design Credit. Walkable Streets

B.

Green Infrastructure and Buildings Credit. Solar Orientation

C.

Neighborhood Pattern and Design Credit. Mixed-Use Neighborhoods

D.

Green infrastructure and Buildings Credit, optimize Building Energy Performance

Questions 27

For a 100% previously developed site, which of the following steps should the project team take during the Initial stages of planning to meet the requirements of Smart Location and Linkage Prerequisite. Imperiled Species and Ecological Communities Conservation?

Options:
A.

Take minimum precautions A 100% previously developed site meets the requirements

B.

Work with a qualified biologist to restore ecological communities, using only native plants on at least 10% of the development footprint

C.

Create conservation easements to prepare for the possibility that threatened or endangered species are found after the site plan has been approved

D.

Consult with the state Natural Heritage Program and state fish and wildlife agencies to determine if there are any threatened or endangered species on the site.

Questions 28

The baseline energy use for the Green Infrastructure and Buildings credit. Infrastructure Energy Efficiency is calculated by using

Options:
A.

current infrastructure items used by IgCC standard.

B.

the lowest first-cost infrastructure item assumed for the protect

C.

infrastructure items recommended by the National Lighting Safely institute

D.

a 15% increase above the minimum requirements for infrastructure items in the state's energy code.

Questions 29

An Erosion and Sedimentation Control Plan Is required to achieve Green infrastructure and Buildings Prerequisite Construction Activity Pollution Prevention.Which of the following Is an objective of this prerequisite?

Options:
A.

increasing stormwater flow rates off a site

B.

Providing a long term strategy for flood control

C.

Preventing air pollution with dust and particulate matter

D.

Reducing greenhouse gas emissions associated with the project

Questions 30

Which strategycontributes to earning points for the Green Infrastructure and Buildings Credit, Indoor Water Use Reduction?

Options:
A.

Non-potable water for cooling towers

B.

Dual-flush toilet

C.

Native vegetation

D.

Water submeters

Exam Code: LEED-AP-ND
Certification Provider: USGBC
Exam Name: LEED AP Neighborhood Development (LEED ND)
Last Update: Jul 16, 2025
Questions: 100
PDF + Testing Engine
$164.99
$66
Testing Engine
$124.99
$50
PDF (Q&A)
$104.99
$42

USGBC Related Exams

How to pass USGBC LEED-Green-Associate - LEED Green Associate Exam Exam
How to pass USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED AP BD+C) Exam
How to pass USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M) Exam
How to pass USGBC LEED-AP-ID+C - LEED AP Interior Design + Construction (LEED AP ID+C) V4 Exam
How to pass USGBC LEED-AP-Homes - LEED AP Homes (Residential) Exam Exam

USGBC Free Exams

USGBC Free Exams
Enhance your USGBC exam prep with free resources and practice tests from Examstrack. Achieve USGBC certification success by exploring Examstrack.