Free PECB ISO-45001-Lead-Auditor Practice Exam with Questions & Answers | Set: 4

Questions 31

An internal auditor of a manufacturer of plastic packaging products for the food industry raised a nonconformity against section 10.2 of ISO 45001 in Report IA202. The nonconformity (NC3) stated: " The level of reported health and safety incidents has increased by 9.7% over the last 12 months. This included an increase in reported accidents. " A third-party auditor reviewing the internal audit process came across the nonconformity and found that there was no evidence of having been reported to relevant staff. Select three of the following nonconformities that the auditor could raise to ISO 45001.

Options:
A.

9.2.2.e - Management failed to take any action to deal with the audit nonconformity.

B.

9.2.2.d - Staff were not made aware that health and safety incidents were increasing.

C.

8.1.1 - Operations were not properly controlled to avoid health and safety incidents.

D.

9.2.2 - Report IA202 contained a poorly worded nonconformity (NC3).

E.

10.2.b - The root cause of the increase in reported health and safety accidents was not investigated.

F.

7.4.3 - The results of the internal audit IA202 were not communicated to interested parties.

PECB ISO-45001-Lead-Auditor Premium Access
Questions 32

Showitoff is an organisation spcialising in the design and production of wall decorating material for the domestic market. During an ISO 45001 certification audit of the site, the auditor comes across an open, walled area just outside the maintenance department. It contains various scraps of wood and metal as well as several rusty components. Several heavy concrete beams are learning against a thin brick wall in which cracks are visible. When asked about it, the OHS Manager states that he presume that the material come from maintenance work, so it is the Maintenance Manager’s responsibility.

The auditor interviews the Maintenance Manager in his department. He asks about the area outside and is told that it contains some excess materials that the Manager likes to keep in case they come in handy at some stage. The auditor points out that the wall appears to be unstable collapse at any moment. The Maintenance Manager is not aware of such a situation.

Which three statement represent good audit practice?

Options:
A.

The auditor should advice the organisation to get rid of the walled area.

B.

The audit should ask the Maintenance Manager to conduct a safety survey.

C.

The audit should check the lines of communication between the OHS Manager and maintenance Manager.

D.

The auditor should check whether the organization has identified the safety hazards associated with the walled area.

E.

The auditor should consider surveying more areas of the site for other potentially unsafe situations.

F.

The audit should demand that the Maintenance Manager deals with the wall.

G.

The audit should raise a nonconformity against ISO 45001.

Questions 33

Which two of the following are ' objectives ' in relation to a first-party audit?

Options:
A.

Apply international standards

B.

Complete the audit on time

C.

Confirm the scope of the management system is accurate

D.

Prepare the audit report for the certification body

E.

Verify compliance with regulatory requirements

F.

Update the management policy

Questions 34

A well-known fast-food organisation (ISO 45001 certified) contracts young people to deliver orders; last week one of them died in a street accident riding for the first time a new motorbike provided by the organisation. You will lead the recertification audit in two weeks, and you plan to prepare a checklist to investigate this incident. The following are potential questions you might ask; match them to the related ISO 45001 clause/subclause. 

ISO-45001-Lead-Auditor Question 34

Options:
Questions 35

You are carrying out a follow-up audit of a chrome plating organisation. At their last assessment, they were found to be storing dangerous chemicals in a wooden shed with a damaged door and a broken lock.

The corrective action agreed was that the shed would be replaced with a metal building with a tamper-proof lock and that there would be bars across the windows.

However, none of the work has been done and the organisation suspect you are going to issue a bad report as a result. To prevent this, they offer to re-chrome your vintage sports car. You tell them that you have had a previous quote for this work, which came in at £3,500. They say they will do the work for £350 if your audit report does not mention their failure to fix the building.

How would you react?

Options:
A.

Suspend the audit and leave the site. Report the attempted bribe to the individual managing the audit programme and avoid all further contact with the auditee.

B.

Accept the auditee ' s assurance that the work will be completed within the next two weeks and move on to your next checklist item. Make no record of the building or the bribe in your audit report.

C.

Record in the audit report that the building had been replaced at the time of audit (no one is likely to check). Then book your car in for the re-chroming to be done.

D.

Cancel the current follow-up and reschedule it with top management to a date in the future when the building will be in place. Agree an appointment with them to fix your car at their reduced rate.

Certification Provider: PECB
Exam Name: PECB Certified OHSMS ISO 45001 Lead Auditor Exam
Last Update: Sep 20, 2026
Questions: 119