When creating a blueprint, which Pre-create and Post-delete tasks are valid?
An administrator needs to configure a Prism Central automation task to be notified if production VMs exceed the CPU threshold of 70%.
How can this be achieved?
When creating a Playbook using alerts, which types of actions can be executed?
While creating a Runbook, which type should an administrator select to performed a REST API call?
An administrator wants to be alerted when production VMs become idle. The VMs will be determined to be idle when CPU usage is lower than 5% for more than 5 minutes. All affected VMs are categorized as Environment:Production, since they have Flow microsegmentation rules.
What should the administrator do to satisfy this requirement?
What are the two types of Blueprints?
An administrator needs to deploy blueprints to Calm SaaS and begin executing them, Before the administrator can execute a blueprint, what must be configured in the environment where the blueprint will be deployed?
Refer to the exhibit.
The Playbook is designed to execute a script, in order to fix a known problem in the application. However, it keeps failing.
Why is this Playbook continuing to fail?
An administrator has added a new account in Self-Service (formerly Calm) but receives the error:
Which step is missing in order for the account to be usable in a Self-Service project?
Refer to the exhibit.
A Blueprint fails on executing a check-login task against a Windows 2016 VM and displays the error shown in the exhibit. The administrator is using a SSH key-based credential to authenticate the task.
What should the administrator change to resolve the issue?
PDF + Testing Engine
|
---|
$66 |
Testing Engine
|
---|
$50 |
PDF (Q&A)
|
---|
$42 |
Nutanix Free Exams |
---|
![]() |